IAC logo
IAC Assessment: AS0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Corrugated Packaging
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 100,000
Annual Production 72,000 Thousand Feet
Production Hrs. Annual 3,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,676 1,028,429 kWh $0.06
Electricity Demand $8,802 3,164 kW-months/year $2.78
Electricity Fees $6,339 - $ -
TOTAL ENERGY COSTS $82,635
RECOMMENDED SAVINGS* $43,432 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $526
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,173
Cost:
$1,725
$841 15,240 $332 52 - - $841
15,240
kWh
$332
52
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,090
Cost:
$7,878
$2,121 38,394 $969 152 - - $2,121
38,394
kWh
$969
152
kW-months/year
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$526
Cost:
$30
$384 7,034 $142 22 - - $384
7,034
kWh
$142
22
kW-months/year
-
-
$
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,328
Cost:
$90
$901 16,413 $427 67 - - $901
16,413
kWh
$427
67
kW-months/year
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,776
Cost:
$2,985
- - $3,776 362 - - -
-
kWh
$3,776
362
kW-months/year
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$21,316
Cost:
$8,000
$18,402 333,529 $2,914 343 - - $18,402
333,529
kWh
$2,914
343
kW-months/year
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$659
Cost:
$1,981
$431 7,913 $228 36 - - $431
7,913
kWh
$228
36
kW-months/year
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$326
Cost:
$60
$213 3,810 $113 18 - - $213
3,810
kWh
$113
18
kW-months/year
-
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$750
Cost:
$30
- - - - $750 - -
-
kWh
-
-
kW-months/year
$750
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$9,840
Cost:
$60
- - - - $9,840 - -
-
kWh
-
-
kW-months/year
$9,840
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$648
Cost:
$30
- - - - $648 - -
-
kWh
-
-
kW-months/year
$648
-
$
TOTAL RECOMMENDED Savings:
$43,432
Cost:
$22,869
$23,293 422,333 $8,901 1,052 $11,238 - $23,293
422,333
kWh
$8,901
1,052
kW-months/year
$11,238
-
$
TOTAL IMPLEMENTED Savings:
$526
Cost:
$30
$384 7,034 $142 22 - - $384
7,034
kWh
$142
22
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes