IAC logo
IAC Assessment: AS0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Commercial Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 18,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,927 568,288 kWh $0.10
Electricity Fees $5,542 - $ -
Natural Gas $439 41 MMBtu $10.71
TOTAL ENERGY COSTS $64,583
RECOMMENDED SAVINGS* $38,094 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,372
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes By-product Production Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes By-product Production
$ kWh $ lb $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$748
Cost:
$771
$748 6,741 - - - - - - - - $748
6,741
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,440
Cost:
$6,500
$12,440 113,716 - - - - - - - - $12,440
113,716
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$370
Cost:
$60
$370 3,517 - - - - - - - - $370
3,517
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,398
Cost:
$1,360
$1,398 12,896 - - - - - - - - $1,398
12,896
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$1,384
Cost:
$320
$1,384 12,603 - - - - - - - - $1,384
12,603
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,898
Cost:
$8,400
$4,898 44,842 - - - - - - - - $4,898
44,842
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,805
Cost:
$901
$1,805 16,413 - - - - - - - - $1,805
16,413
kWh
-
-
lb
-
-
lb
-
-
$
-
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,000
Cost:
$30
- - - - - - $1,000 - - - -
-
kWh
-
-
lb
-
-
lb
$1,000
-
$
-
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,811
Cost:
$60
- - - - - - $4,811 - - - -
-
kWh
-
-
lb
-
-
lb
$4,811
-
$
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,900
Cost:
-
- - $300 72,000 - - - - $3,600 - -
-
kWh
$300
72,000
lb
-
-
lb
-
-
$
$3,600
-
$
11: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,440
Cost:
$60
- - - - - - $1,440 - - - -
-
kWh
-
-
lb
-
-
lb
$1,440
-
$
-
-
$
12: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$3,900
Cost:
$7,500
- - - - $3,900 660 - - - - -
-
kWh
-
-
lb
$3,900
660
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,094
Cost:
$25,962
$23,043 210,728 $300 72,000 $3,900 660 $7,251 - $3,600 - $23,043
210,728
kWh
$300
72,000
lb
$3,900
660
lb
$7,251
-
$
$3,600
-
$
TOTAL IMPLEMENTED Savings:
$18,372
Cost:
$10,712
$4,321 39,567 $300 72,000 $3,900 660 $6,251 - $3,600 - $4,321
39,567
kWh
$300
72,000
lb
$3,900
660
lb
$6,251
-
$
$3,600
-
$
Savings
Cost
$ kWh $ lb $ lb $ $ $ $
Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes By-product Production Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes By-product Production