Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1997 |
Principal Product | Commercial Printing |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 18,000 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $57,927 | 568,288 | kWh | $0.10 |
Electricity Fees | $5,542 | - | $ | - |
Natural Gas | $439 | 41 | MMBtu | $10.71 |
TOTAL ENERGY COSTS | $64,583 | |||
RECOMMENDED SAVINGS* | $38,094 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,372 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | By-product Production | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $748 Cost: $771 |
$748 | 6,741 | - | - | - | - | - | - | - | - |
$748 6,741 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $12,440 Cost: $6,500 |
$12,440 | 113,716 | - | - | - | - | - | - | - | - |
$12,440 113,716 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $370 Cost: $60 |
$370 | 3,517 | - | - | - | - | - | - | - | - |
$370 3,517 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,398 Cost: $1,360 |
$1,398 | 12,896 | - | - | - | - | - | - | - | - |
$1,398 12,896 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $1,384 Cost: $320 |
$1,384 | 12,603 | - | - | - | - | - | - | - | - |
$1,384 12,603 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $4,898 Cost: $8,400 |
$4,898 | 44,842 | - | - | - | - | - | - | - | - |
$4,898 44,842 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,805 Cost: $901 |
$1,805 | 16,413 | - | - | - | - | - | - | - | - |
$1,805 16,413 kWh |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,000 Cost: $30 |
- | - | - | - | - | - | $1,000 | - | - | - |
- - kWh |
- - lb |
- - lb |
$1,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $4,811 Cost: $60 |
- | - | - | - | - | - | $4,811 | - | - | - |
- - kWh |
- - lb |
- - lb |
$4,811 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $3,900 Cost: - |
- | - | $300 | 72,000 | - | - | - | - | $3,600 | - |
- - kWh |
$300 72,000 lb |
- - lb |
- - $ |
$3,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,440 Cost: $60 |
- | - | - | - | - | - | $1,440 | - | - | - |
- - kWh |
- - lb |
- - lb |
$1,440 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $3,900 Cost: $7,500 |
- | - | - | - | $3,900 | 660 | - | - | - | - |
- - kWh |
- - lb |
$3,900 660 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,094 Cost: $25,962 |
$23,043 | 210,728 | $300 | 72,000 | $3,900 | 660 | $7,251 | - | $3,600 | - | $23,043 210,728 kWh |
$300 72,000 lb |
$3,900 660 lb |
$7,251 - $ |
$3,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,372 Cost: $10,712 |
$4,321 | 39,567 | $300 | 72,000 | $3,900 | 660 | $6,251 | - | $3,600 | - | $4,321 39,567 kWh |
$300 72,000 lb |
$3,900 660 lb |
$6,251 - $ |
$3,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | By-product Production | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | By-product Production |