Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1998 |
Principal Product | Cardboard Boxes |
NAICS | n/a |
SIC | 2653 - Corrugated And Solid Fiber Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 50,000 Tons |
Production Hrs. Annual | 6,400 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $208,235 | 5,980,070 | kWh | $0.03 |
Electricity Demand | $103,907 | 12,865 | kW-months/year | $8.08 |
Electricity Fees | $55,666 | - | $ | - |
Natural Gas | $319,354 | 79,576 | MMBtu | $4.01 |
TOTAL ENERGY COSTS | $734,416 | |||
RECOMMENDED SAVINGS* | $186,336 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,266 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,249 Cost: $280 |
$12,464 | 345,838 | $5,785 | 652 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$12,464 345,838 kWh |
$5,785 652 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,087 Cost: $3,745 |
$559 | 15,533 | $528 | 60 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$559 15,533 kWh |
$528 60 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,243 Cost: $120 |
$2,221 | 61,547 | $1,022 | 231 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,221 61,547 kWh |
$1,022 231 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $3,365 Cost: $60 |
$3,365 | 93,200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$3,365 93,200 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,487 Cost: $8,291 |
$4,442 | 122,802 | $2,045 | 229 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$4,442 122,802 kWh |
$2,045 229 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $51,367 Cost: $40,600 |
$35,178 | 973,623 | $16,189 | 1,825 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$35,178 973,623 kWh |
$16,189 1,825 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $784 Cost: $480 |
$784 | 21,688 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$784 21,688 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $407 Cost: $220 |
- | - | - | - | $218 | 54 | $189 | 67,890 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$218 54 MMBtu |
$189 67,890 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $18,575 Cost: $800 |
- | - | - | - | - | - | - | - | $18,575 | 27,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$18,575 27,000 gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $9,828 Cost: $48,000 |
- | - | - | - | - | - | - | - | - | - | $2,548 | - | - | - | - | - | $7,280 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$2,548 - lb |
- - $ |
- - $ |
$7,280 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.7121 IMPROVE HANDLING PRACTICES |
Savings: $5,156 Cost: $850 |
- | - | - | - | - | - | - | - | - | - | - | - | $5,156 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$5,156 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $67,788 Cost: $3,600 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $67,788 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
$67,788 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $186,336 Cost: $107,046 |
$59,013 | 1,634,231 | $25,569 | 2,997 | $218 | 54 | $189 | 67,890 | $18,575 | 27,000 | $2,548 | - | $5,156 | - | $67,788 | - | $7,280 | - | $59,013 1,634,231 kWh |
$25,569 2,997 kW-months/year |
$218 54 MMBtu |
$189 67,890 Tgal |
$18,575 27,000 gal |
$2,548 - lb |
$5,156 - $ |
$67,788 - $ |
$7,280 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,266 Cost: $11,101 |
$23,276 | 645,075 | $8,852 | 1,112 | $218 | 54 | $189 | 67,890 | $18,575 | 27,000 | - | - | $5,156 | - | - | - | - | - | $23,276 645,075 kWh |
$8,852 1,112 kW-months/year |
$218 54 MMBtu |
$189 67,890 Tgal |
$18,575 27,000 gal |
- - lb |
$5,156 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production |