IAC logo
IAC Assessment: AS0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Recycled Rubber
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 47
Plant Area (Sq.Ft.) 60,000
Annual Production 34,500,000 Pounds
Production Hrs. Annual 7,200
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,993 8,414,127 kWh $0.03
Electricity Demand $144,851 16,731 kW-months/year $8.66
Electricity Fees $83,303 - $ -
TOTAL ENERGY COSTS $509,136
RECOMMENDED SAVINGS* $204,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $132,745
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,248
Cost:
$4,077
$1,300 42,497 $948 85 - - - - $1,300
42,497
kWh
$948
85
kW-months/year
-
-
gal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$558
Cost:
$975
$332 10,844 $226 19 - - - - $332
10,844
kWh
$226
19
kW-months/year
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,576
Cost:
$3,402
$2,852 93,200 $1,724 155 - - - - $2,852
93,200
kWh
$1,724
155
kW-months/year
-
-
gal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,653
Cost:
$26,233
$9,755 318,288 $5,898 530 - - - - $9,755
318,288
kWh
$5,898
530
kW-months/year
-
-
gal
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,301
Cost:
$60
$811 26,377 $490 44 - - - - $811
26,377
kWh
$490
44
kW-months/year
-
-
gal
-
-
$
06: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$700
Cost:
$30
- - - - $700 - - - -
-
kWh
-
-
kW-months/year
$700
-
gal
-
-
$
07: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$55,877
Cost:
$3,200
- - - - - - $55,877 - -
-
kWh
-
-
kW-months/year
-
-
gal
$55,877
-
$
08: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$123,920
Cost:
$215,000
- - - - - - $123,920 - -
-
kWh
-
-
kW-months/year
-
-
gal
$123,920
-
$
TOTAL RECOMMENDED Savings:
$204,833
Cost:
$252,977
$15,050 491,206 $9,286 833 $700 - $179,797 - $15,050
491,206
kWh
$9,286
833
kW-months/year
$700
-
gal
$179,797
-
$
TOTAL IMPLEMENTED Savings:
$132,745
Cost:
$222,569
$4,963 162,074 $3,162 284 $700 - $123,920 - $4,963
162,074
kWh
$3,162
284
kW-months/year
$700
-
gal
$123,920
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes