IAC Assessment: AS0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Sanitary Products
NAICS n/a
SIC 2676 - Sanitary Paper Products
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 53,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 4,750
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,128 2,101,114 kWh $0.06
Electricity Demand $17,213 6,455 kW-months/year $2.67
Electricity Fees $157,361 - $ -
TOTAL ENERGY COSTS $310,920
RECOMMENDED SAVINGS* $103,074 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,066
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,409
Cost:
$5,640
$1,865 34,291 $544 86 - - - - - - - - - - $1,865
34,291
kWh
$544
86
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,122
Cost:
$1,420
$869 15,826 $253 40 - - - - - - - - - - $869
15,826
kWh
$253
40
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$571
Cost:
$700
$443 8,206 $128 20 - - - - - - - - - - $443
8,206
kWh
$128
20
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$132
Cost:
$225
$132 2,345 - - - - - - - - - - - - $132
2,345
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$16,449
Cost:
$7,556
- - - - $430 - - - - - $16,019 - - - -
-
kWh
-
-
kW-months/year
$430
-
lb
-
-
$
-
-
$
$16,019
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,241
Cost:
$120
- - - - $1,635 - $(-938) - $380 - - - $164 - -
-
kWh
-
-
kW-months/year
$1,635
-
lb
$(-938)
-
$
$380
-
$
-
-
$
$164
-
$
07: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$81,150
Cost:
$9,280
- - - - - - $590 - - - $80,560 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$590
-
$
-
-
$
$80,560
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$103,074
Cost:
$24,941
$3,309 60,668 $925 146 $2,065 - $(-348) - $380 - $96,579 - $164 - $3,309
60,668
kWh
$925
146
kW-months/year
$2,065
-
lb
$(-348)
-
$
$380
-
$
$96,579
-
$
$164
-
$
TOTAL IMPLEMENTED Savings:
$3,066
Cost:
$2,465
$1,444 26,377 $381 60 $1,635 - $(-938) - $380 - - - $164 - $1,444
26,377
kWh
$381
60
kW-months/year
$1,635
-
lb
$(-938)
-
$
$380
-
$
-
-
$
$164
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material By-product Production