IAC Assessment: AS0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Semiconductors
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 80,000
Annual Production 728,000 Pieces
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $644,280 12,961,606 kWh $0.05
Electricity Demand $64,927 22,276 kW-months/year $2.91
Electricity Fees $53,104 - $ -
Natural Gas $235,957 47,021 MMBtu $5.02
TOTAL ENERGY COSTS $1,165,021
RECOMMENDED SAVINGS* $293,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,703
Cost:
$26,778
$15,648 404,455 $6,055 544 - - - - - - $15,648
404,455
kWh
$6,055
544
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,677
Cost:
$2,148
$1,202 31,067 $475 42 - - - - - - $1,202
31,067
kWh
$475
42
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,361
Cost:
$2,700
$2,412 62,427 $949 85 - - - - - - $2,412
62,427
kWh
$949
85
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$14,376
Cost:
$15,000
- - - - $14,376 - - - - - -
-
kWh
-
-
kW-months/year
$14,376
-
lb
-
-
$
-
-
$
05: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$7,303
Cost:
$60
- - - - - - - - $7,303 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$7,303
-
$
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$244,608
Cost:
$111,104
- - - - - - $244,608 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$244,608
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$293,028
Cost:
$157,790
$19,262 497,949 $7,479 671 $14,376 - $244,608 - $7,303 - $19,262
497,949
kWh
$7,479
671
kW-months/year
$14,376
-
lb
$244,608
-
$
$7,303
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Administrative Changes