IAC logo
IAC Assessment: AS0247
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0247
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Airbag Components
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 50,000
Annual Production 13,500,000 Pieces
Production Hrs. Annual 7,120
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,106 3,512,896 kWh $0.06
Electricity Demand $15,088 8,600 kW-months/year $1.75
Electricity Fees $15,631 - $ -
TOTAL ENERGY COSTS $259,069
RECOMMENDED SAVINGS* $74,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,811
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$7,511
Cost:
$13,983
$7,511 156,800 - - - - - - $7,511
156,800
kWh
-
-
kW-months/year
-
-
gal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$498
Cost:
$20
$386 8,206 $112 14 - - - - $386
8,206
kWh
$112
14
kW-months/year
-
-
gal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$587
Cost:
$1,275
$440 9,086 $147 19 - - - - $440
9,086
kWh
$147
19
kW-months/year
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$226
Cost:
$253
$132 2,638 $94 11 - - - - $132
2,638
kWh
$94
11
kW-months/year
-
-
gal
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,734
Cost:
$4,593
$2,232 36,049 $502 61 - - - - $2,232
36,049
kWh
$502
61
kW-months/year
-
-
gal
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$18,060
Cost:
$5,209
- - - - $18,060 4,076 - - -
-
kWh
-
-
kW-months/year
$18,060
4,076
gal
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$19,300
Cost:
$120
- - - - $19,300 - - - -
-
kWh
-
-
kW-months/year
$19,300
-
gal
-
-
$
08: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$25,200
Cost:
$24,000
- - - - - - $25,200 - -
-
kWh
-
-
kW-months/year
-
-
gal
$25,200
-
$
TOTAL RECOMMENDED Savings:
$74,116
Cost:
$49,453
$10,701 212,779 $855 105 $37,360 4,076 $25,200 - $10,701
212,779
kWh
$855
105
kW-months/year
$37,360
4,076
gal
$25,200
-
$
TOTAL IMPLEMENTED Savings:
$45,811
Cost:
$25,668
$958 19,930 $353 44 $19,300 - $25,200 - $958
19,930
kWh
$353
44
kW-months/year
$19,300
-
gal
$25,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes