Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1999 |
Principal Product | Structural Steel |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 4,000 Tons |
Production Hrs. Annual | 2,125 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,978 | 415,885 | kWh | $0.07 |
Electricity Demand | $7,421 | 2,938 | kW-months/year | $2.53 |
Electricity Fees | $2,285 | - | $ | - |
TOTAL ENERGY COSTS | $38,493 | |||
RECOMMENDED SAVINGS* | $10,571 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,400 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $351 Cost: $375 |
$351 | 4,982 | - | - | - | - | - | - | - | - |
$351 4,982 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,404 Cost: $120 |
$1,160 | 16,120 | $244 | 85 | - | - | - | - | - | - |
$1,160 16,120 kWh |
$244 85 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $641 Cost: $2,625 |
$549 | 7,620 | $92 | 32 | - | - | - | - | - | - |
$549 7,620 kWh |
$92 32 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $213 Cost: $792 |
$52 | 586 | $12 | 5 | $17 | 19 | $132 | - | - | - |
$52 586 kWh |
$12 5 kW-months/year |
$17 19 gal |
$132 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,775 Cost: $90 |
- | - | - | - | $1,775 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,775 - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $6,187 Cost: $90 |
- | - | - | - | - | - | - | - | $6,187 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$6,187 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,571 Cost: $4,092 |
$2,112 | 29,308 | $348 | 122 | $1,792 | 19 | $132 | - | $6,187 | - | $2,112 29,308 kWh |
$348 122 kW-months/year |
$1,792 19 gal |
$132 - $ |
$6,187 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,400 Cost: $882 |
$52 | 586 | $12 | 5 | $17 | 19 | $132 | - | $6,187 | - | $52 586 kWh |
$12 5 kW-months/year |
$17 19 gal |
$132 - $ |
$6,187 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Ancillary Material Cost | By-product Production |