IAC logo
IAC Assessment: AS0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Oak Cabinets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 82,000
Annual Production 100,000 Pieces
Production Hrs. Annual 2,900
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,691 1,852,579 kWh $0.06
Electricity Demand $14,593 5,460 kW-months/year $2.67
Electricity Fees $9,141 - $ -
Natural Gas $11,121 1,793 MMBtu $6.20
TOTAL ENERGY COSTS $155,135
RECOMMENDED SAVINGS* $184,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,785
Cost:
$7,353
$1,524 39,859 $1,261 112 - - - - - - $1,524
39,859
kWh
$1,261
112
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$574
Cost:
$1,050
$342 9,086 $232 21 - - - - - - $342
9,086
kWh
$232
21
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$304
Cost:
$377
$129 3,517 $48 4 $62 - - - $65 - $129
3,517
kWh
$48
4
kW-months/year
$62
-
$
-
-
$
$65
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$122
Cost:
$100
$54 1,465 $68 6 - - - - - - $54
1,465
kWh
$68
6
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,039
Cost:
$60
$1,039 27,257 - - - - - - - - $1,039
27,257
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,615
Cost:
$7,674
$1,813 47,479 $2,802 250 - - - - - - $1,813
47,479
kWh
$2,802
250
kW-months/year
-
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$472
Cost:
$120
- - - - - - $472 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$472
-
$
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$172,500
Cost:
$26,000
- - - - $172,500 - - - - - -
-
kWh
-
-
kW-months/year
$172,500
-
$
-
-
$
-
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,626
Cost:
$240
- - - - $2,376 - - - $(-750) - -
-
kWh
-
-
kW-months/year
$2,376
-
$
-
-
$
$(-750)
-
$
TOTAL RECOMMENDED Savings:
$184,037
Cost:
$42,974
$4,901 128,663 $4,411 393 $174,938 - $472 - $(-685) - $4,901
128,663
kWh
$4,411
393
kW-months/year
$174,938
-
$
$472
-
$
$(-685)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost