IAC logo
IAC Assessment: AS0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 45,000
Annual Production 2,196,400 Pieces
Production Hrs. Annual 6,732
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,087 6,222,743 kWh $0.05
Electricity Demand $36,880 15,168 kW-months/year $2.43
Electricity Fees $60,160 - $ -
TOTAL ENERGY COSTS $553,369
RECOMMENDED SAVINGS* $88,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost By-product Production Increase in Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost By-product Production Increase in Production
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ $ $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,779
Cost:
$15,136
$7,428 142,438 $351 60 - - - - - - - - - - - - - - - - $7,428
142,438
kWh
$351
60
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,019
Cost:
$14,000
$5,874 116,354 $145 160 - - - - - - - - - - - - - - - - $5,874
116,354
kWh
$145
160
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$401
Cost:
$510
$239 4,396 $17 5 - - - - $72 - - - $73 - - - - - - - $239
4,396
kWh
$17
5
kW-months/year
-
-
Tgal
-
-
lb
$72
-
$
-
-
$
$73
-
$
-
-
$
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$176
Cost:
$158
$62 1,172 - - - - - - $98 - - - $16 - - - - - - - $62
1,172
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$98
-
$
-
-
$
$16
-
$
-
-
$
-
-
$
-
-
%
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$816
Cost:
$1,466
$699 12,603 $117 22 - - - - - - - - - - - - - - - - $699
12,603
kWh
$117
22
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$640
Cost:
$975
$611 11,430 $29 24 - - - - - - - - - - - - - - - - $611
11,430
kWh
$29
24
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,969
Cost:
$120
- - - - - - $1,349 - - - - - - - - - $1,620 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,349
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
$1,620
-
$
-
-
%
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$384
Cost:
$60
- - - - - - $384 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$384
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$8,160
Cost:
$120
- - - - - - $8,160 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$8,160
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
10: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$5,595
Cost:
$820
- - - - $5,595 1,816,875 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,595
1,816,875
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
11: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$54,284
Cost:
$180,000
- - - - - - - - $48,960 - - - - - - - - - $5,324 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$48,960
-
$
-
-
$
-
-
$
-
-
$
-
-
$
$5,324
-
%
12: 4.8120 APPLY FOR INVESTMENT INCENTIVES Savings:
$1,580
Cost:
$60
- - - - - - - - - - $1,066 - - - $514 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$1,066
-
$
-
-
$
$514
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$88,803
Cost:
$213,425
$14,913 288,393 $659 271 $5,595 1,816,875 $9,893 - $49,130 - $1,066 - $89 - $514 - $1,620 - $5,324 - $14,913
288,393
kWh
$659
271
kW-months/year
$5,595
1,816,875
Tgal
$9,893
-
lb
$49,130
-
$
$1,066
-
$
$89
-
$
$514
-
$
$1,620
-
$
$5,324
-
%
TOTAL IMPLEMENTED Savings:
$26,704
Cost:
$31,570
$14,302 276,963 $630 247 - - $9,893 - $170 - - - $89 - - - $1,620 - - - $14,302
276,963
kWh
$630
247
kW-months/year
-
-
Tgal
$9,893
-
lb
$170
-
$
-
-
$
$89
-
$
-
-
$
$1,620
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost By-product Production Increase in Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost By-product Production Increase in Production