Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2000 |
Principal Product | Acrylic Spas |
NAICS | n/a |
SIC | 3088 - Plastics Plumbing Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 2,678 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $124,172 | 1,997,948 | kWh | $0.06 |
Electricity Demand | $21,466 | 7,999 | kW-months/year | $2.68 |
Electricity Fees | $8,838 | - | $ | - |
Natural Gas | $11,660 | 1,687 | MMBtu | $6.91 |
TOTAL ENERGY COSTS | $173,771 | |||
RECOMMENDED SAVINGS* | $70,831 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,547 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,105 Cost: $3,527 |
$795 | 14,361 | $310 | 54 | - | - | - | - | - | - | - | - | - | - |
$795 14,361 kWh |
$310 54 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $449 Cost: $240 |
$449 | 8,206 | - | - | - | - | - | - | - | - | - | - | - | - |
$449 8,206 kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $474 Cost: $525 |
$474 | 8,499 | - | - | - | - | - | - | - | - | - | - | - | - |
$474 8,499 kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,403 Cost: $140 |
$3,007 | 54,807 | $1,396 | 245 | - | - | - | - | - | - | - | - | - | - |
$3,007 54,807 kWh |
$1,396 245 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $593 Cost: $1,365 |
$405 | 7,327 | $188 | 33 | - | - | - | - | - | - | - | - | - | - |
$405 7,327 kWh |
$188 33 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $13,808 Cost: $90 |
- | - | - | - | - | - | $13,808 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$13,808 - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $575 Cost: $60 |
- | - | - | - | - | - | $575 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$575 - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $370 Cost: $170 |
- | - | - | - | $370 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$370 - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $1,545 Cost: $60 |
- | - | - | - | - | - | - | - | - | - | $1,545 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
$1,545 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $3,240 Cost: $12,060 |
- | - | - | - | - | - | - | - | - | - | $3,240 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
$3,240 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $44,269 Cost: $150,000 |
- | - | - | - | - | - | $522 | - | $19,272 | - | - | - | $24,475 | - |
- - kWh |
- - kW-months/year |
- - gal |
$522 - lb |
$19,272 - $ |
- - $ |
$24,475 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,831 Cost: $168,237 |
$5,130 | 93,200 | $1,894 | 332 | $370 | - | $14,905 | - | $19,272 | - | $4,785 | - | $24,475 | - | $5,130 93,200 kWh |
$1,894 332 kW-months/year |
$370 - gal |
$14,905 - lb |
$19,272 - $ |
$4,785 - $ |
$24,475 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,547 Cost: $152,120 |
$3,886 | 70,633 | $1,584 | 278 | - | - | $14,330 | - | $19,272 | - | - | - | $24,475 | - | $3,886 70,633 kWh |
$1,584 278 kW-months/year |
- - gal |
$14,330 - lb |
$19,272 - $ |
- - $ |
$24,475 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Raw Material |