Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2000 |
Principal Product | Plastic Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $165,930 | 3,558,910 | kWh | $0.05 |
Electricity Demand | $30,082 | 6,768 | kW-months/year | $4.44 |
Electricity Fees | $14,156 | - | $ | - |
Natural Gas | $1,569 | 150 | MMBtu | $10.46 |
TOTAL ENERGY COSTS | $216,909 | |||
RECOMMENDED SAVINGS* | $92,450 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,580 Cost: $220 |
$8,421 | 163,247 | $1,159 | 233 | - | - | - | - | - | - | - | - |
$8,421 163,247 kWh |
$1,159 233 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,074 Cost: $7,709 |
$3,582 | 69,461 | $492 | 99 | - | - | - | - | - | - | - | - |
$3,582 69,461 kWh |
$492 99 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,336 Cost: $5,790 |
$2,900 | 55,979 | $436 | 87 | - | - | - | - | - | - | - | - |
$2,900 55,979 kWh |
$436 87 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $864 Cost: $60 |
- | - | - | - | - | - | - | - | $(-216) | - | $1,080 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$(-216) - $ |
$1,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $71,251 Cost: $9,660 |
$(-7,949) | (-230,363) | - | (-1,728) | $103,200 | 960,000 | $(-24,000) | - | - | - | - | - |
$(-7,949) (-230,363) kWh |
- (-1,728) kW-months/year |
$103,200 960,000 lb |
$(-24,000) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $1,239 Cost: $120 |
- | - | - | - | - | - | - | - | $1,239 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$1,239 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $2,106 Cost: $60 |
- | - | - | - | - | - | - | - | $2,106 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$2,106 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $92,450 Cost: $23,619 |
$6,954 | 58,324 | $2,087 | (-1,309) | $103,200 | 960,000 | $(-24,000) | - | $3,129 | - | $1,080 | - | $6,954 58,324 kWh |
$2,087 (-1,309) kW-months/year |
$103,200 960,000 lb |
$(-24,000) - $ |
$3,129 - $ |
$1,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | By-product Production |