Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2000 |
Principal Product | Plastic Products |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 78,000 |
Annual Production | 1,485,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $257,245 | 4,085,287 | kWh | $0.06 |
Electricity Demand | $57,224 | 7,975 | kW-months/year | $7.18 |
Electricity Fees | $29,127 | - | $ | - |
TOTAL ENERGY COSTS | $349,201 | |||
RECOMMENDED SAVINGS* | $391,632 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,059 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,109 Cost: $12,163 |
$12,881 | 186,987 | $2,228 | 309 | - | - | - | - | - | - | - | - | - | - |
$12,881 186,987 kWh |
$2,228 309 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,996 Cost: $2,925 |
$1,699 | 22,567 | $297 | 41 | - | - | - | - | - | - | - | - | - | - |
$1,699 22,567 kWh |
$297 41 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $2,658 Cost: $1,605 |
$2,182 | 31,946 | $476 | 66 | - | - | - | - | - | - | - | - | - | - |
$2,182 31,946 kWh |
$476 66 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $16,673 Cost: $30,000 |
$14,577 | 212,485 | $2,096 | 291 | - | - | - | - | - | - | - | - | - | - |
$14,577 212,485 kWh |
$2,096 291 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,337 Cost: $1,066 |
$1,164 | 16,999 | $173 | 24 | - | - | - | - | - | - | - | - | - | - |
$1,164 16,999 kWh |
$173 24 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,719 Cost: $60 |
$1,416 | 20,809 | $303 | 42 | - | - | - | - | - | - | - | - | - | - |
$1,416 20,809 kWh |
$303 42 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $683 Cost: $220 |
$597 | 8,792 | $86 | 18 | - | - | - | - | - | - | - | - | - | - |
$597 8,792 kWh |
$86 18 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $995 Cost: $378 |
$995 | 15,533 | - | - | - | - | - | - | - | - | - | - | - | - |
$995 15,533 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $287 Cost: $60 |
- | - | - | - | $995 | 529,032 | - | - | $(-708) | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$995 529,032 Tgal |
- - lb |
$(-708) - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $444 Cost: $60 |
- | - | - | - | - | - | $444 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$444 - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $697 Cost: $60 |
- | - | - | - | - | - | $697 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$697 - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.126 INSTALL SENSORS TO DETECT DEFECTS |
Savings: $136,234 Cost: $16,000 |
$(-6,753) | (-98,476) | $(-1,013) | (-141) | - | - | - | - | - | - | $144,000 | - | - | - |
$(-6,753) (-98,476) kWh |
$(-1,013) (-141) kW-months/year |
- - Tgal |
- - lb |
- - $ |
$144,000 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
Savings: $212,800 Cost: $30,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $212,800 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
$212,800 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $391,632 Cost: $94,597 |
$28,758 | 417,642 | $4,646 | 650 | $995 | 529,032 | $1,141 | - | $(-708) | - | $144,000 | - | $212,800 | - | $28,758 417,642 kWh |
$4,646 650 kW-months/year |
$995 529,032 Tgal |
$1,141 - lb |
$(-708) - $ |
$144,000 - $ |
$212,800 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,059 Cost: $45,272 |
$31,799 | 463,950 | $4,973 | 690 | $995 | 529,032 | - | - | $(-708) | - | - | - | - | - | $31,799 463,950 kWh |
$4,973 690 kW-months/year |
$995 529,032 Tgal |
- - lb |
$(-708) - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Increase in Production |