IAC logo
IAC Assessment: AS0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Foam Wood Extrusions
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 55,000
Annual Production 6,400,000 Pieces
Production Hrs. Annual 6,120
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,516 3,718,933 kWh $0.06
Electricity Demand $12,141 7,154 kW-months/year $1.70
Electricity Fees $16,785 - $ -
TOTAL ENERGY COSTS $283,794
RECOMMENDED SAVINGS* $229,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,166
Cost:
$1,549
$866 18,171 $300 37 - - - - - - - - $866
18,171
kWh
$300
37
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,526
Cost:
$7,394
$4,422 93,494 $1,104 136 - - - - - - - - $4,422
93,494
kWh
$1,104
136
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,513
Cost:
$960
- - - - - - $1,513 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,513
-
$
-
-
$
-
-
$
04: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$216,399
Cost:
$200,000
$(-109) (-2,345) $(-1,172) (-144) $85,680 - - - $132,000 - - - $(-109)
(-2,345)
kWh
$(-1,172)
(-144)
kW-months/year
$85,680
-
$
-
-
$
$132,000
-
$
-
-
$
05: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,858
Cost:
$120
- - $8,346 1,028 $(-4,488) - - - - - - - -
-
kWh
$8,346
1,028
kW-months/year
$(-4,488)
-
$
-
-
$
-
-
$
-
-
$
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,339
Cost:
$2,000
- - - - $672 - - - - - $667 - -
-
kWh
-
-
kW-months/year
$672
-
$
-
-
$
-
-
$
$667
-
$
TOTAL RECOMMENDED Savings:
$229,801
Cost:
$212,023
$5,179 109,320 $8,578 1,057 $81,864 - $1,513 - $132,000 - $667 - $5,179
109,320
kWh
$8,578
1,057
kW-months/year
$81,864
-
$
$1,513
-
$
$132,000
-
$
$667
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost