Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2000 |
Principal Product | Flat Circuits and Flex board |
NAICS | n/a |
SIC | 3678 - Electronic Connectors |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 8,568 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $772,676 | 16,445,194 | kWh | $0.05 |
Electricity Fees | $140,854 | - | $ | - |
Natural Gas | $132,086 | 23,111 | MMBtu | $5.72 |
TOTAL ENERGY COSTS | $1,316,468 | |||
RECOMMENDED SAVINGS* | $37,507 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,045 Cost: $382 |
$3,645 | 115,182 | $400 | 161 | - | - | - | - | - | - | - | - | - | - |
$3,645 115,182 kWh |
$400 161 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,469 Cost: $3,800 |
$5,814 | 183,763 | $655 | 264 | - | - | - | - | - | - | - | - | - | - |
$5,814 183,763 kWh |
$655 264 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,073 Cost: $6,959 |
$3,711 | 104,338 | $362 | 146 | - | - | - | - | - | - | - | - | - | - |
$3,711 104,338 kWh |
$362 146 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $407 Cost: $609 |
$217 | 6,741 | $17 | 7 | - | - | - | - | $86 | - | - | - | $87 | - |
$217 6,741 kWh |
$17 7 kW-months/year |
- - gal |
- - lb |
$86 - $ |
- - $ |
$87 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,262 Cost: $120 |
$10,262 | 324,736 | - | - | - | - | - | - | - | - | - | - | - | - |
$10,262 324,736 kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,244 Cost: $120 |
- | - | - | - | - | - | - | - | - | - | $1,244 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
$1,244 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $576 Cost: $60 |
- | - | - | - | - | - | $576 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$576 - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $4,509 Cost: $780 |
- | - | - | - | $5,836 | 3,857 | - | - | $(-1,327) | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,836 3,857 gal |
- - lb |
$(-1,327) - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $5,355 Cost: $1,500 |
- | - | - | - | - | - | - | - | $5,355 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$5,355 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $567 Cost: $120 |
- | - | - | - | - | - | - | - | - | - | $567 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
$567 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,507 Cost: $14,450 |
$23,649 | 734,760 | $1,434 | 578 | $5,836 | 3,857 | $576 | - | $4,114 | - | $1,811 | - | $87 | - | $23,649 734,760 kWh |
$1,434 578 kW-months/year |
$5,836 3,857 gal |
$576 - lb |
$4,114 - $ |
$1,811 - $ |
$87 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |