IAC logo
IAC Assessment: AS0287
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0287
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Dispersion Systems, Extended Range Munitions, Gas Generators
NAICS n/a
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 500,000
Annual Production 250,000 Pieces
Production Hrs. Annual 2,588
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,570 4,997,655 kWh $0.06
Electricity Demand $31,099 11,295 kW-months/year $2.75
Electricity Fees $20,000 - $ -
TOTAL ENERGY COSTS $338,833
RECOMMENDED SAVINGS* $81,073 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,324
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,756
Cost:
$17,407
$4,118 105,803 $4,638 420 - - - - - - - - $4,118
105,803
kWh
$4,638
420
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$682
Cost:
$315
$198 4,982 $212 19 $233 - - - $39 - - - $198
4,982
kWh
$212
19
kW-months/year
$233
-
$
-
-
$
$39
-
$
-
-
$
03: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$501
Cost:
$240
$501 12,896 - - - - - - - - - - $501
12,896
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,295
Cost:
$4,875
$2,507 64,478 $1,788 718 - - - - - - - - $2,507
64,478
kWh
$1,788
718
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$572
Cost:
$2,394
$247 6,448 $325 29 - - - - - - - - $247
6,448
kWh
$325
29
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$25,067
Cost:
$24,000
$14,713 378,370 $10,354 1,752 - - - - - - - - $14,713
378,370
kWh
$10,354
1,752
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$668
Cost:
$120
- - - - - - $668 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$668
-
$
-
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,700
Cost:
$60
- - - - - - - - - - $2,700 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$2,700
-
$
09: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$37,832
Cost:
$100,000
- - - - - - - - - - $37,832 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$37,832
-
$
TOTAL RECOMMENDED Savings:
$81,073
Cost:
$149,411
$22,284 572,977 $17,317 2,938 $233 - $668 - $39 - $40,532 - $22,284
572,977
kWh
$17,317
2,938
kW-months/year
$233
-
$
$668
-
$
$39
-
$
$40,532
-
$
TOTAL IMPLEMENTED Savings:
$34,324
Cost:
$41,647
$19,332 497,069 $14,992 2,172 - - - - - - - - $19,332
497,069
kWh
$14,992
2,172
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost By-product Production