IAC logo
IAC Assessment: AS0288
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0288
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Dispersion Systems, Extended Range Munitions, Gas Generators
NAICS n/a
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 500,000
Annual Production 250,000 Pieces
Production Hrs. Annual 2,588
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,921 4,172,626 kWh $0.07
Electricity Demand $31,725 11,697 kW-months/year $2.71
Electricity Fees $17,927 - $ -
TOTAL ENERGY COSTS $347,001
RECOMMENDED SAVINGS* $33,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,176
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,163
Cost:
$2,397
$512 13,189 $651 59 - - - - $512
13,189
kWh
$651
59
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$468
Cost:
$1,130
$206 5,569 $262 25 - - - - $206
5,569
kWh
$262
25
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,416
Cost:
$3,589
$1,035 26,671 $1,381 125 - - - - $1,035
26,671
kWh
$1,381
125
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$488
Cost:
$1,275
$213 5,569 $275 49 - - - - $213
5,569
kWh
$275
49
kW-months/year
-
-
lb
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$15,129
Cost:
$11,400
$10,228 262,896 $4,901 1,476 - - - - $10,228
262,896
kWh
$4,901
1,476
kW-months/year
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,100
Cost:
$11,396
$1,218 31,360 $1,882 170 - - - - $1,218
31,360
kWh
$1,882
170
kW-months/year
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,959
Cost:
-
$1,276 32,825 $1,683 152 - - - - $1,276
32,825
kWh
$1,683
152
kW-months/year
-
-
lb
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$668
Cost:
$120
- - - - $668 - - - -
-
kWh
-
-
kW-months/year
$668
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,700
Cost:
$60
- - - - $2,700 - - - -
-
kWh
-
-
kW-months/year
$2,700
-
lb
-
-
$
10: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$4,649
Cost:
$12,600
- - - - - - $4,649 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,649
-
$
TOTAL RECOMMENDED Savings:
$33,740
Cost:
$43,967
$14,688 378,079 $11,035 2,056 $3,368 - $4,649 - $14,688
378,079
kWh
$11,035
2,056
kW-months/year
$3,368
-
lb
$4,649
-
$
TOTAL IMPLEMENTED Savings:
$19,176
Cost:
$18,516
$11,981 308,325 $7,195 1,685 - - - - $11,981
308,325
kWh
$7,195
1,685
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes