IAC logo
IAC Assessment: AS0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Sheet metal fabrication, powder metal coatings
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 60,000 Pieces
Production Hrs. Annual 3,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,930 334,680 kWh $0.09
Electricity Demand $3,017 1,830 kW-months/year $1.65
Electricity Fees $2,374 - $ -
Natural Gas $45,790 6,445 MMBtu $7.10
TOTAL ENERGY COSTS $81,522
RECOMMENDED SAVINGS* $196,505 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $105,685
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$895
Cost:
$120
$621 8,374 $274 52 - - - - - - $621
8,374
kWh
$274
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$1,241
Cost:
$1,992
$1,241 16,740 - - - - - - - - $1,241
16,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$764
Cost:
$2,484
- - - - $764 110 - - - - -
-
kWh
-
-
kW-months/year
$764
110
MMBtu
-
-
$
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$5,488
Cost:
$648
$4,280 57,750 $1,208 231 - - - - - - $4,280
57,750
kWh
$1,208
231
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$64,704
Cost:
$8,580
- - - - - - $64,704 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$64,704
-
$
-
-
$
06: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$58,240
Cost:
$688
- - - - - - $58,240 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$58,240
-
$
-
-
$
07: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$29,680
Cost:
$438
- - - - - - - - $29,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$29,680
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$19,493
Cost:
$294
$1,536 20,728 - - - - $17,957 - - - $1,536
20,728
kWh
-
-
kW-months/year
-
-
MMBtu
$17,957
-
$
-
-
$
09: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$16,000
Cost:
$3,940
- - - - - - - - $16,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$16,000
-
$
TOTAL RECOMMENDED Savings:
$196,505
Cost:
$19,184
$7,678 103,592 $1,482 283 $764 110 $140,901 - $45,680 - $7,678
103,592
kWh
$1,482
283
kW-months/year
$764
110
MMBtu
$140,901
-
$
$45,680
-
$
TOTAL IMPLEMENTED Savings:
$105,685
Cost:
$13,462
$5,816 78,478 $1,208 231 - - $82,661 - $16,000 - $5,816
78,478
kWh
$1,208
231
kW-months/year
-
-
MMBtu
$82,661
-
$
$16,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost