IAC logo
IAC Assessment: AS0308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Rubber hoses, soakers, and sprinklers
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 120,000
Annual Production 1,200 Thousand Feet
Production Hrs. Annual 4,776
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,669 4,069,520 kWh $0.06
Electricity Demand $25,916 10,562 kW-months/year $2.45
Electricity Fees $20,205 - $ -
Natural Gas $12,373 1,505 MMBtu $8.22
TOTAL ENERGY COSTS $288,163
RECOMMENDED SAVINGS* $176,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$339
Cost:
$548
$159 3,979 $180 16 - - - - - - $159
3,979
kWh
$180
16
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,345
Cost:
$120
$792 19,868 $553 50 - - - - - - $792
19,868
kWh
$553
50
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,163
Cost:
$4,543
$599 19,399 $564 50 - - - - - - $599
19,399
kWh
$564
50
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$961
Cost:
$30
$413 10,354 $548 50 - - - - - - $413
10,354
kWh
$548
50
kW-months/year
-
-
$
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$23,040
Cost:
$60
- - - - - - - - $23,040 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$23,040
-
$
06: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$660
Cost:
$106
- - - - $660 - - - - - -
-
kWh
-
-
kW-months/year
$660
-
$
-
-
$
-
-
$
07: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$107,375
Cost:
$3,303
- - - - - - $107,375 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$107,375
-
$
-
-
$
08: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$41,767
Cost:
$9,675
- - - - $41,767 - - - - - -
-
kWh
-
-
kW-months/year
$41,767
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$176,650
Cost:
$18,385
$1,963 53,600 $1,845 166 $42,427 - $107,375 - $23,040 - $1,963
53,600
kWh
$1,845
166
kW-months/year
$42,427
-
$
$107,375
-
$
$23,040
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material By-product Production