IAC logo
IAC Assessment: AS0312
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0312
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Plating and grinding of chrome-coated pieces
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $500,000-$1,000,000
# of Employees 11
Plant Area (Sq.Ft.) 4,080
Annual Production 1,600 Units
Production Hrs. Annual 2,428
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,482 530,000 kWh $0.08
Electricity Demand $1,690 1,063 kW-months/year $1.59
Electricity Fees $2,987 - $ -
Natural Gas $29,867 4,224 MMBtu $7.07
TOTAL ENERGY COSTS $76,871
RECOMMENDED SAVINGS* $20,847 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,723
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$95
Cost:
$20
$70 971 $25 10 - - $70
971
kWh
$25
10
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16
Cost:
$22
$12 164 $4 1 - - $12
164
kWh
$4
1
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$110
Cost:
$265
$82 1,124 $28 6 - - $82
1,124
kWh
$28
6
kW-months/year
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$458
Cost:
$747
$458 6,278 - - - - $458
6,278
kWh
-
-
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$666
Cost:
$60
$607 8,322 $59 11 - - $607
8,322
kWh
$59
11
kW-months/year
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$779
Cost:
$60
- - - - $779 - -
-
kWh
-
-
kW-months/year
$779
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$576
Cost:
$60
- - - - $576 - -
-
kWh
-
-
kW-months/year
$576
-
$
08: 4.426 MODIFY WORKLOAD Savings:
$2,000
Cost:
$2,640
- - - - $2,000 - -
-
kWh
-
-
kW-months/year
$2,000
-
$
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$16,147
Cost:
$1,786
- - - - $16,147 - -
-
kWh
-
-
kW-months/year
$16,147
-
$
TOTAL RECOMMENDED Savings:
$20,847
Cost:
$5,660
$1,229 16,859 $116 28 $19,502 - $1,229
16,859
kWh
$116
28
kW-months/year
$19,502
-
$
TOTAL IMPLEMENTED Savings:
$19,723
Cost:
$4,853
$164 2,259 $57 17 $19,502 - $164
2,259
kWh
$57
17
kW-months/year
$19,502
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes