IAC logo
IAC Assessment: AS0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2001
Principal Product Precision aluminum extrusions
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $1,000,000-$5,000,000
# of Employees 23
Plant Area (Sq.Ft.) 20,000
Annual Production 250,000 Pounds
Production Hrs. Annual 2,772
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,949 439,040 kWh $0.06
Electricity Demand $4,571 1,847 kW-months/year $2.47
Electricity Fees $3,070 - $ -
Natural Gas $8,486 958 MMBtu $8.86
TOTAL ENERGY COSTS $44,076
RECOMMENDED SAVINGS* $137,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,002
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$474
Cost:
$996
$474 8,370 - - - - - - - - $474
8,370
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$256
Cost:
$751
$192 3,381 $64 11 - - - - - - $192
3,381
kWh
$64
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,375
Cost:
$112
$6,308 111,293 $3,067 535 - - - - - - $6,308
111,293
kWh
$3,067
535
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$538
Cost:
$30
$374 6,596 $164 29 - - - - - - $374
6,596
kWh
$164
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$283
Cost:
$766
- - - - $283 37 - - - - -
-
kWh
-
-
kW-months/year
$283
37
MMBtu
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$142
Cost:
$50
$142 2,496 - - - - - - - - $142
2,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,340
Cost:
$1,262
- - - - - - - - $11,340 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,340
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$1,055
Cost:
$40
- - - - - - - - $1,055 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,055
-
$
09: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$38,822
Cost:
$4,156
- - - - - - - - $38,822 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$38,822
-
$
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$74,880
Cost:
$1,732
- - - - - - $74,880 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$74,880
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$137,165
Cost:
$9,895
$7,490 132,136 $3,295 575 $283 37 $74,880 - $51,217 - $7,490
132,136
kWh
$3,295
575
kW-months/year
$283
37
MMBtu
$74,880
-
$
$51,217
-
$
TOTAL IMPLEMENTED Savings:
$62,002
Cost:
$7,397
$7,490 132,136 $3,295 575 - - - - $51,217 - $7,490
132,136
kWh
$3,295
575
kW-months/year
-
-
MMBtu
-
-
$
$51,217
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes