IAC logo
IAC Assessment: AS0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Petroleum refining and asphalt
NAICS n/a
SIC 2911 - Petroleum Refining
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 365,904
Annual Production 170,000 Tons
Production Hrs. Annual 7,288
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,570 1,754,720 kWh $0.08
Electricity Demand $10,367 6,365 kW-months/year $1.63
Electricity Fees $11,514 - $ -
Natural Gas $1,096,503 140,981 MMBtu $7.78
TOTAL ENERGY COSTS $1,267,708
RECOMMENDED SAVINGS* $325,363 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $308,346
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,660
Cost:
$14,391
$10,447 143,646 $1,213 236 - - - - - - $10,447
143,646
kWh
$1,213
236
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,578
Cost:
$3,816
$2,085 28,670 $493 96 - - - - - - $2,085
28,670
kWh
$493
96
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$194
Cost:
$600
$151 2,083 $43 8 - - - - - - $151
2,083
kWh
$43
8
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,995
Cost:
$4,200
$1,458 20,045 $537 104 - - - - - - $1,458
20,045
kWh
$537
104
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$14,828
Cost:
$11,575
- - - - $5,000 50 $9,828 - - - -
-
kWh
-
-
kW-months/year
$5,000
50
gal
$9,828
-
$
-
-
$
06: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$294,108
Cost:
$3,024
- - - - - - - - $294,108 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$294,108
-
$
TOTAL RECOMMENDED Savings:
$325,363
Cost:
$37,606
$14,141 194,444 $2,286 444 $5,000 50 $9,828 - $294,108 - $14,141
194,444
kWh
$2,286
444
kW-months/year
$5,000
50
gal
$9,828
-
$
$294,108
-
$
TOTAL IMPLEMENTED Savings:
$308,346
Cost:
$21,231
$12,532 172,316 $1,706 332 - - - - $294,108 - $12,532
172,316
kWh
$1,706
332
kW-months/year
-
-
gal
-
-
$
$294,108
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes