IAC logo
IAC Assessment: AS0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Trusses for prefabricated wooden buildings
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 1,000,000
Annual Production 14,000 Thousand Feet
Production Hrs. Annual 4,845
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,156 2,366,160 kWh $0.06
Electricity Demand $15,541 6,602 kW-months/year $2.35
Electricity Fees $13,510 - $ -
TOTAL ENERGY COSTS $166,274
RECOMMENDED SAVINGS* $26,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,436
Cost:
$62,000
$15,548 385,530 $888 79 - - $15,548
385,530
kWh
$888
79
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,944
Cost:
$7,938
$2,887 71,593 $2,057 184 - - $2,887
71,593
kWh
$2,057
184
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$425
Cost:
$1,500
$250 6,194 $175 16 - - $250
6,194
kWh
$175
16
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,870
Cost:
$120
$1,870 46,365 - - - - $1,870
46,365
kWh
-
-
kW-months/year
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,103
Cost:
$2,802
$541 13,416 $562 50 - - $541
13,416
kWh
$562
50
kW-months/year
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,358
Cost:
$176
- - - - $1,358 - -
-
kWh
-
-
kW-months/year
$1,358
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$222
Cost:
$60
- - - - $222 - -
-
kWh
-
-
kW-months/year
$222
-
$
TOTAL RECOMMENDED Savings:
$26,358
Cost:
$74,596
$21,096 523,098 $3,682 329 $1,580 - $21,096
523,098
kWh
$3,682
329
kW-months/year
$1,580
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes