IAC logo
IAC Assessment: AS0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Plastic storage containers
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 763,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $823,575 26,013,680 kWh $0.03
Electricity Demand $463,946 43,170 kW-months/year $10.75
Electricity Fees $114,834 - $ -
TOTAL ENERGY COSTS $1,442,504
RECOMMENDED SAVINGS* $194,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,576
Cost:
$4,955
$1,264 31,772 $1,312 134 - - - - $1,264
31,772
kWh
$1,312
134
kW-months/year
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$784
Cost:
$975
$402 10,104 $382 40 - - - - $402
10,104
kWh
$382
40
kW-months/year
-
-
Tgal
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$346
Cost:
$1,200
$148 3,722 $198 20 - - - - $148
3,722
kWh
$198
20
kW-months/year
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,056
Cost:
$3,042
$3,786 571,176 $1,270 782 - - - - $3,786
571,176
kWh
$1,270
782
kW-months/year
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$48,861
Cost:
$260
$35,593 894,969 $13,268 1,362 - - - - $35,593
894,969
kWh
$13,268
1,362
kW-months/year
-
-
Tgal
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,742
Cost:
$16,800
$27,508 691,690 $9,234 948 - - - - $27,508
691,690
kWh
$9,234
948
kW-months/year
-
-
Tgal
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$775
Cost:
$60
- - - - $775 180,193 - - -
-
kWh
-
-
kW-months/year
$775
180,193
Tgal
-
-
$
08: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$77,282
Cost:
$10,792
- - - - - - $77,282 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$77,282
-
$
09: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$21,858
Cost:
$486
- - - - - - $21,858 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$21,858
-
$
TOTAL RECOMMENDED Savings:
$194,280
Cost:
$38,570
$68,701 2,203,433 $25,664 3,286 $775 180,193 $99,140 - $68,701
2,203,433
kWh
$25,664
3,286
kW-months/year
$775
180,193
Tgal
$99,140
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $