Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2003 |
Principal Product | Deli Sandwiches |
NAICS | 311991 - Perishable Prepared Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 52,000,000 Pieces |
Production Hrs. Annual | 2,921 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $218,227 | 3,638,600 | kWh | $0.06 |
Electricity Demand | $14,066 | 8,484 | kW-months/year | $1.66 |
Electricity Fees | $17,038 | - | $ | - |
TOTAL ENERGY COSTS | $253,120 | |||
RECOMMENDED SAVINGS* | $586,538 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $853 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,753 Cost: $8,149 |
$928 | 20,129 | $739 | 94 | - | - | - | - | - | - | $86 | - | - | - |
$928 20,129 kWh |
$739 94 kW-months/year |
- - gal |
- - $ |
- - $ |
$86 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $500 Cost: $750 |
$500 | 10,850 | - | - | - | - | - | - | - | - | - | - | - | - |
$500 10,850 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $813 Cost: $2,376 |
$477 | 10,338 | $336 | 48 | - | - | - | - | - | - | - | - | - | - |
$477 10,338 kWh |
$336 48 kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $497 Cost: $30 |
$292 | 6,325 | $205 | 26 | - | - | - | - | - | - | - | - | - | - |
$292 6,325 kWh |
$205 26 kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,918 Cost: $6,084 |
$2,298 | 49,851 | $1,620 | 205 | - | - | - | - | - | - | - | - | - | - |
$2,298 49,851 kWh |
$1,620 205 kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $853 Cost: - |
$853 | 18,502 | - | - | - | - | - | - | - | - | - | - | - | - |
$853 18,502 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $3,367 Cost: $3,600 |
$2,114 | 45,860 | $1,253 | 158 | - | - | - | - | - | - | - | - | - | - |
$2,114 45,860 kWh |
$1,253 158 kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7145 INSTALL SKYLIGHTS |
Savings: $751 Cost: $1,958 |
$751 | 16,299 | - | - | - | - | - | - | - | - | - | - | - | - |
$751 16,299 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $969 Cost: $3,231 |
$289 | 4,818 | $131 | 26 | $549 | 50 | - | - | - | - | - | - | - | - |
$289 4,818 kWh |
$131 26 kW-months/year |
$549 50 gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,251 Cost: $387 |
$1,682 | 44,505 | $1,569 | 198 | - | - | - | - | - | - | - | - | - | - |
$1,682 44,505 kWh |
$1,569 198 kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $258,120 Cost: $14,080 |
- | - | - | - | - | - | $258,120 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$258,120 - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $37,933 Cost: $57,000 |
- | - | - | - | - | - | $37,933 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$37,933 - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $15,933 Cost: $22,000 |
- | - | - | - | - | - | $15,933 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$15,933 - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.125 |
Savings: $88,920 Cost: $1,140 |
- | - | - | - | - | - | - | - | - | - | - | - | $88,920 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
$88,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $168,960 Cost: $8,364 |
- | - | - | - | - | - | - | - | $168,960 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - $ |
$168,960 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $586,538 Cost: $129,149 |
$10,184 | 227,477 | $5,853 | 755 | $549 | 50 | $311,986 | - | $168,960 | - | $86 | - | $88,920 | - | $10,184 227,477 kWh |
$5,853 755 kW-months/year |
$549 50 gal |
$311,986 - $ |
$168,960 - $ |
$86 - $ |
$88,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $853 Cost: - |
$853 | 18,502 | - | - | - | - | - | - | - | - | - | - | - | - | $853 18,502 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Primary Product |