IAC Assessment: AS0343
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0343
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product FNC Batteries for Aircraft
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 41,000
Annual Production 2,100 Pieces
Production Hrs. Annual 4,233
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,680 3,421,252 kWh $0.06
Electricity Demand $21,747 7,731 kW-months/year $2.81
Electricity Fees $17,262 - $ -
Natural Gas $22,311 2,406 MMBtu $9.27
TOTAL ENERGY COSTS $255,000
RECOMMENDED SAVINGS* $492,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,493
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,371
Cost:
$20,633
$1,958 49,433 $1,413 140 - - - - - - $1,958
49,433
kWh
$1,413
140
kW-months/year
-
-
$
-
-
$
-
-
%
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$228
Cost:
$30
$132 3,341 $96 10 - - - - - - $132
3,341
kWh
$96
10
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,795
Cost:
$30
$6,139 121,804 $656 346 - - - - - - $6,139
121,804
kWh
$656
346
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.4311 RECOVER MECHANICAL ENERGY Savings:
$1,455
Cost:
$250
$845 21,333 $610 60 - - - - - - $845
21,333
kWh
$610
60
kW-months/year
-
-
$
-
-
$
-
-
%
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$12,973
Cost:
$30,140
$7,530 190,158 $5,443 540 - - - - - - $7,530
190,158
kWh
$5,443
540
kW-months/year
-
-
$
-
-
$
-
-
%
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,552
Cost:
$6,867
$14,059 355,028 $6,493 644 - - - - - - $14,059
355,028
kWh
$6,493
644
kW-months/year
-
-
$
-
-
$
-
-
%
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$48
Cost:
$134
$30 765 $18 2 - - - - - - $30
765
kWh
$18
2
kW-months/year
-
-
$
-
-
$
-
-
%
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$6,600
Cost:
$60
- - - - - - $6,600 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,600
-
$
-
-
%
09: 4.426 MODIFY WORKLOAD Savings:
$41,600
Cost:
$250
- - - - $41,600 - - - - - -
-
kWh
-
-
kW-months/year
$41,600
-
$
-
-
$
-
-
%
10: 4.446 AUTOMATE FINISHING PROCESS Savings:
$10,575
Cost:
$22,000
- - - - $10,575 - - - - - -
-
kWh
-
-
kW-months/year
$10,575
-
$
-
-
$
-
-
%
11: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$68,455
Cost:
$3,840
- - - - - - $68,455 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$68,455
-
$
-
-
%
12: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$319,824
Cost:
$3,600
- - - - - - - - $319,824 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$319,824
-
%
TOTAL RECOMMENDED Savings:
$492,476
Cost:
$87,834
$30,693 741,862 $14,729 1,742 $52,175 - $75,055 - $319,824 - $30,693
741,862
kWh
$14,729
1,742
kW-months/year
$52,175
-
$
$75,055
-
$
$319,824
-
%
TOTAL IMPLEMENTED Savings:
$89,493
Cost:
$49,840
$22,156 526,265 $8,562 1,130 $52,175 - $6,600 - - - $22,156
526,265
kWh
$8,562
1,130
kW-months/year
$52,175
-
$
$6,600
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production