Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2003 |
Principal Product | Concrete Pipe and Steel Pipe |
NAICS | 327332 - Concrete Pipe Manufacturing |
SIC | 3272 - Concrete Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 1,916,640 |
Annual Production | 0 Units |
Production Hrs. Annual | 3,125 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $255,874 | 4,032,599 | kWh | $0.06 |
Electricity Demand | $21,307 | 12,887 | kW-months/year | $1.65 |
Electricity Fees | $16,380 | - | $ | - |
Natural Gas | $89,206 | 9,643 | MMBtu | $9.25 |
TOTAL ENERGY COSTS | $382,767 | |||
RECOMMENDED SAVINGS* | $48,046 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,171 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $892 Cost: $4,873 |
$530 | 11,669 | $212 | 48 | - | - | $150 | - |
$530 11,669 kWh |
$212 48 kW-months/year |
- - MMBtu |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $42,103 Cost: $570 |
$28,318 | 622,911 | $13,785 | 3,148 | - | - | - | - |
$28,318 622,911 kWh |
$13,785 3,148 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,388 Cost: $2,160 |
$918 | 20,198 | $470 | 107 | - | - | - | - |
$918 20,198 kWh |
$470 107 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $295 Cost: $1,000 |
$289 | 6,367 | $6 | 28 | - | - | - | - |
$289 6,367 kWh |
$6 28 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $279 Cost: $1,990 |
$187 | 6,879 | $92 | 1 | - | - | - | - |
$187 6,879 kWh |
$92 1 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,983 Cost: $300 |
$1,924 | 42,328 | $59 | 14 | - | - | - | - |
$1,924 42,328 kWh |
$59 14 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,106 Cost: $1,264 |
- | - | - | - | $1,106 | 121 | - | - |
- - kWh |
- - kW-months/year |
$1,106 121 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,046 Cost: $12,157 |
$32,166 | 710,352 | $14,624 | 3,346 | $1,106 | 121 | $150 | - | $32,166 710,352 kWh |
$14,624 3,346 kW-months/year |
$1,106 121 MMBtu |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,171 Cost: $6,984 |
$29,712 | 656,355 | $14,353 | 3,284 | $1,106 | 121 | - | - | $29,712 656,355 kWh |
$14,353 3,284 kW-months/year |
$1,106 121 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |