Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2003 |
Principal Product | Printed Labels |
NAICS | 323111 - Commercial Printing (except Screen and Books) |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 52,000 |
Annual Production | 31,000 Thousand Feet |
Production Hrs. Annual | 4,572 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,415 | 1,125,600 | kWh | $0.07 |
Electricity Demand | $27,206 | 3,401 | kW-months/year | $8.00 |
Electricity Fees | $5,138 | - | $ | - |
Natural Gas | $5,180 | 699 | MMBtu | $7.41 |
TOTAL ENERGY COSTS | $114,484 | |||
RECOMMENDED SAVINGS* | $172,038 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $119,831 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,155 Cost: $30,070 |
$6,601 | 93,825 | $1,602 | 192 | - | - | - | - | $952 | - |
$6,601 93,825 kWh |
$1,602 192 kW-months/year |
- - lb |
- - $ |
$952 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $939 Cost: $68 |
$700 | 9,957 | $239 | 29 | - | - | - | - | - | - |
$700 9,957 kWh |
$239 29 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7145 INSTALL SKYLIGHTS |
Savings: $4,122 Cost: $10,296 |
$4,122 | 58,587 | - | - | - | - | - | - | - | - |
$4,122 58,587 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,479 Cost: $100 |
$6,456 | 91,768 | $2,023 | 241 | - | - | - | - | - | - |
$6,456 91,768 kWh |
$2,023 241 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $935 Cost: $20 |
$743 | 10,564 | $192 | 23 | - | - | - | - | - | - |
$743 10,564 kWh |
$192 23 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $697 Cost: $675 |
$697 | 9,903 | - | - | - | - | - | - | - | - |
$697 9,903 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $43 Cost: $87 |
$33 | 474 | $10 | 1 | - | - | - | - | - | - |
$33 474 kWh |
$10 1 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $39,566 Cost: $55,100 |
$33,077 | 470,185 | $6,489 | 1,152 | - | - | - | - | - | - |
$33,077 470,185 kWh |
$6,489 1,152 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,865 Cost: $10,800 |
$5,489 | 78,021 | $1,376 | 205 | - | - | - | - | - | - |
$5,489 78,021 kWh |
$1,376 205 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $957 Cost: $4,260 |
$957 | 19,381 | - | - | - | - | - | - | - | - |
$957 19,381 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,280 Cost: $17,100 |
- | - | - | - | $4,280 | 48,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,280 48,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $96,000 Cost: $8,340 |
- | - | - | - | - | - | $96,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$96,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $172,038 Cost: $136,916 |
$58,875 | 842,665 | $11,931 | 1,843 | $4,280 | 48,000 | $96,000 | - | $952 | - | $58,875 842,665 kWh |
$11,931 1,843 kW-months/year |
$4,280 48,000 lb |
$96,000 - $ |
$952 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $119,831 Cost: $55,785 |
$14,533 | 206,588 | $4,066 | 486 | $4,280 | 48,000 | $96,000 | - | $952 | - | $14,533 206,588 kWh |
$4,066 486 kW-months/year |
$4,280 48,000 lb |
$96,000 - $ |
$952 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||