IAC logo
IAC Assessment: AS0358
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0358
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Corrugated Boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 117,000
Annual Production 120,000 Thousand Feet
Production Hrs. Annual 4,224
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,572 1,009,440 kWh $0.06
Electricity Demand $6,945 2,932 kW-months/year $2.37
Electricity Fees $5,313 - $ -
TOTAL ENERGY COSTS $75,875
RECOMMENDED SAVINGS* $115,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,843
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$383
Cost:
$1,819
$228 5,317 $155 30 - - - - - - $228
5,317
kWh
$155
30
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,694
Cost:
$310
$2,127 53,179 $1,567 299 - - - - - - $2,127
53,179
kWh
$1,567
299
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$88
Cost:
$200
$88 2,201 - - - - - - - - $88
2,201
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$221
Cost:
$32
$142 3,538 $79 16 - - - - - - $142
3,538
kWh
$79
16
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,266
Cost:
$4,000
$923 23,082 $343 63 - - - - - - $923
23,082
kWh
$343
63
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,918
Cost:
$140
$5,454 136,352 $4,464 852 - - - - - - $5,454
136,352
kWh
$4,464
852
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,222
Cost:
$3,084
$3,410 85,255 $812 155 - - - - - - $3,410
85,255
kWh
$812
155
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$413
Cost:
$862
$385 9,631 - - $28 - - - - - $385
9,631
kWh
-
-
kW-months/year
$28
-
$
-
-
$
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,109
Cost:
$865
$2,046 51,134 $63 12 - - - - - - $2,046
51,134
kWh
$63
12
kW-months/year
-
-
$
-
-
$
-
-
$
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$59,136
Cost:
$4,060
- - - - - - $59,136 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$59,136
-
$
-
-
$
11: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$34,374
Cost:
$12,148
- - - - - - - - $34,374 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$34,374
-
$
TOTAL RECOMMENDED Savings:
$115,824
Cost:
$27,520
$14,803 369,689 $7,483 1,427 $28 - $59,136 - $34,374 - $14,803
369,689
kWh
$7,483
1,427
kW-months/year
$28
-
$
$59,136
-
$
$34,374
-
$
TOTAL IMPLEMENTED Savings:
$21,843
Cost:
$9,293
$14,487 362,171 $7,328 1,397 $28 - - - - - $14,487
362,171
kWh
$7,328
1,397
kW-months/year
$28
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes