IAC logo
IAC Assessment: AS0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 167,000
Annual Production 20,000 Thousand Gallons
Production Hrs. Annual 2,069
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $723,372 15,400,467 kWh $0.05
Electricity Demand $60,333 72,382 kW-months/year $0.83
Electricity Fees $58,705 - $ -
Natural Gas $137,892 17,117 MMBtu $8.06
TOTAL ENERGY COSTS $1,023,424
RECOMMENDED SAVINGS* $20,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,776
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,726
Cost:
$10,607
$1,544 31,097 $182 44 - - $1,544
31,097
kWh
$182
44
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$344
Cost:
$1,350
$344 9,126 - - - - $344
9,126
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,496
Cost:
$30
$986 19,250 $1,510 112 - - $986
19,250
kWh
$1,510
112
kW-months/year
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,463
Cost:
$18,810
- - - - $10,463 - -
-
kWh
-
-
kW-months/year
$10,463
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,253
Cost:
$150
$2,253 44,008 - - - - $2,253
44,008
kWh
-
-
kW-months/year
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$301
Cost:
$616
$152 2,969 $149 11 - - $152
2,969
kWh
$149
11
kW-months/year
-
-
$
07: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$2,438
Cost:
$8,705
$1,789 34,952 $649 48 - - $1,789
34,952
kWh
$649
48
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$20,021
Cost:
$40,268
$7,068 141,402 $2,490 215 $10,463 - $7,068
141,402
kWh
$2,490
215
kW-months/year
$10,463
-
$
TOTAL IMPLEMENTED Savings:
$6,776
Cost:
$11,403
$4,935 97,324 $1,841 167 - - $4,935
97,324
kWh
$1,841
167
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees