IAC Assessment: AS0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Wallboard, Plaster
NAICS 327420 - Gypsum Product Manufacturing
SIC 3275 - Gypsum Products
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 600,000
Annual Production 218,124 Thousand Feet
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,976,152 31,300,918 kWh $0.06
Electricity Demand $169,642 72,871 kW-months/year $2.33
Electricity Fees $535,231 - $ -
Natural Gas $9,390,449 2,475,345 MMBtu $3.79
TOTAL ENERGY COSTS $12,071,474
RECOMMENDED SAVINGS* $1,075,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7145 INSTALL SKYLIGHTS Savings:
$552
Cost:
$22,526
$552 195,216 - - - - $552
195,216
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$265
Cost:
$2,353
$141 18,757 $124 25 - - $141
18,757
kWh
$124
25
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,751
Cost:
$10,939
$900 52,201 $851 195 - - $900
52,201
kWh
$851
195
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,720
Cost:
$750
$6,720 6,026 - - - - $6,720
6,026
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$17,401
Cost:
$10,050
$16,801 141,391 $600 125 - - $16,801
141,391
kWh
$600
125
kW-months/year
-
-
MMBtu
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,049,273
Cost:
$2,100,000
$1,555,500 25,500,000 $255,367 52,871 $(-761,594) (-201,480) $1,555,500
25,500,000
kWh
$255,367
52,871
kW-months/year
$(-761,594)
(-201,480)
MMBtu
TOTAL RECOMMENDED Savings:
$1,075,962
Cost:
$2,146,618
$1,580,614 25,913,591 $256,942 53,216 $(-761,594) (-201,480) $1,580,614
25,913,591
kWh
$256,942
53,216
kW-months/year
$(-761,594)
(-201,480)
MMBtu
TOTAL IMPLEMENTED Savings:
$6,985
Cost:
$3,103
$6,861 24,783 $124 25 - - $6,861
24,783
kWh
$124
25
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas