Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2003 |
Principal Product | Wood Fuel Pellets |
NAICS | 321999 - All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499 - Wood Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 958,320 |
Annual Production | 35,000 Tons |
Production Hrs. Annual | 7,704 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $243,095 | 4,274,000 | kWh | $0.06 |
Electricity Demand | $14,581 | 8,944 | kW-months/year | $1.63 |
Electricity Fees | $16,610 | - | $ | - |
TOTAL ENERGY COSTS | $274,286 | |||
RECOMMENDED SAVINGS* | $100,160 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,682 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $790 Cost: $1,643 |
$680 | 14,903 | $110 | 14 | - | - | - | - |
$680 14,903 kWh |
$110 14 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $290 Cost: $1,535 |
$176 | 3,866 | $95 | 12 | - | - | $19 | - |
$176 3,866 kWh |
$95 12 kW-months/year |
- - lb |
$19 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $140 Cost: $450 |
$140 | 3,074 | - | - | - | - | - | - |
$140 3,074 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,328 Cost: $60 |
$5,783 | 126,826 | $1,545 | 198 | - | - | - | - |
$5,783 126,826 kWh |
$1,545 198 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $183 Cost: $30 |
$144 | 3,159 | $39 | 5 | - | - | - | - |
$144 3,159 kWh |
$39 5 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $274 Cost: $350 |
$167 | 3,657 | $107 | 17 | - | - | - | - |
$167 3,657 kWh |
$107 17 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $88,723 Cost: $78,120 |
$78,541 | 1,740,885 | $10,182 | 132 | - | - | - | - |
$78,541 1,740,885 kWh |
$10,182 132 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $2,432 Cost: $1,059 |
- | - | - | - | $2,432 | 156,000 | - | - |
- - kWh |
- - kW-months/year |
$2,432 156,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $100,160 Cost: $83,247 |
$85,631 | 1,896,370 | $12,078 | 378 | $2,432 | 156,000 | $19 | - | $85,631 1,896,370 kWh |
$12,078 378 kW-months/year |
$2,432 156,000 lb |
$19 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,682 Cost: $3,588 |
$6,806 | 149,252 | $1,857 | 241 | - | - | $19 | - | $6,806 149,252 kWh |
$1,857 241 kW-months/year |
- - lb |
$19 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |