IAC logo
IAC Assessment: AS0371
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0371
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 720
Plant Area (Sq.Ft.) 275,000
Annual Production 208,000 Pieces
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,374,167 24,255,291 kWh $0.06
Electricity Fees $212,130 - $ -
Natural Gas $212,130 32,236 MMBtu $6.58
TOTAL ENERGY COSTS $2,447,824
RECOMMENDED SAVINGS* $212,073 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$87,632
Cost:
$105,000
$74,790 1,350,000 $12,842 2,640 - - $74,790
1,350,000
kWh
$12,842
2,640
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$62,038
Cost:
$22,800
$46,395 1,220,132 $15,643 1,956 - - $46,395
1,220,132
kWh
$15,643
1,956
kW-months/year
-
-
MMBtu
03: 2.2165 SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL Savings:
$17,943
Cost:
$12,000
- - - - $17,943 3,028 -
-
kWh
-
-
kW-months/year
$17,943
3,028
MMBtu
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,453
Cost:
$7,000
$7,335 152,229 $5,118 665 - - $7,335
152,229
kWh
$5,118
665
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,040
Cost:
$45,048
$7,949 162,980 $2,091 277 - - $7,949
162,980
kWh
$2,091
277
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,176
Cost:
$60
$7,473 219,154 $4,703 352 - - $7,473
219,154
kWh
$4,703
352
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,938
Cost:
$144
$3,795 111,378 $3,143 284 - - $3,795
111,378
kWh
$3,143
284
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,853
Cost:
$4,125
$2,853 51,506 - - - - $2,853
51,506
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$212,073
Cost:
$196,177
$150,590 3,267,379 $43,540 6,174 $17,943 3,028 $150,590
3,267,379
kWh
$43,540
6,174
kW-months/year
$17,943
3,028
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas