Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2004 |
Principal Product | Aerospace Cores |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469 - Metal Stampings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 360 |
Plant Area (Sq.Ft.) | 296,825 |
Annual Production | 14,400 Pieces |
Production Hrs. Annual | 6,144 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $630,863 | 16,631,772 | kWh | $0.04 |
Electricity Demand | $313,247 | 35,677 | kW-months/year | $8.78 |
Electricity Fees | $80,647 | - | $ | - |
Natural Gas | $893,941 | 320,567 | MMBtu | $2.79 |
TOTAL ENERGY COSTS | $1,918,698 | |||
RECOMMENDED SAVINGS* | $67,075 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $106 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $52,347 Cost: $28,928 |
$37,893 | 621,196 | $14,454 | 1,517 | - | - | - | - |
$37,893 621,196 kWh |
$14,454 1,517 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,968 Cost: $19,698 |
$4,579 | 75,060 | $1,932 | 203 | - | - | $457 | - |
$4,579 75,060 kWh |
$1,932 203 kW-months/year |
- - MMBtu |
$457 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,226 Cost: $4,125 |
$4,226 | 69,280 | - | - | - | - | - | - |
$4,226 69,280 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,555 Cost: $7,700 |
$1,118 | 18,338 | $437 | 68 | - | - | - | - |
$1,118 18,338 kWh |
$437 68 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,873 Cost: $1,872 |
$1,435 | 23,514 | $438 | 46 | - | - | - | - |
$1,435 23,514 kWh |
$438 46 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $106 Cost: $51 |
- | - | - | - | $106 | 42 | - | - |
- - kWh |
- - kW-months/year |
$106 42 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,075 Cost: $62,374 |
$49,251 | 807,388 | $17,261 | 1,834 | $106 | 42 | $457 | - | $49,251 807,388 kWh |
$17,261 1,834 kW-months/year |
$106 42 MMBtu |
$457 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $106 Cost: $51 |
- | - | - | - | $106 | 42 | - | - | - - kWh |
- - kW-months/year |
$106 42 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |