Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Aerospace Cores
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $50,000,000-$100,000,000
# of Employees 360
Plant Area (Sq.Ft.) 296,825
Annual Production 14,400 Pieces
Production Hrs. Annual 6,144
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $630,863 16,631,772 kWh $0.04
Electricity Demand $313,247 35,677 kW-months/year $8.78
Electricity Fees $80,647 - $ -
Natural Gas $893,941 320,567 MMBtu $2.79
TOTAL ENERGY COSTS $1,918,698
RECOMMENDED SAVINGS* $67,075 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,347
Cost:
$28,928
$37,893 621,196 $14,454 1,517 - - - - $37,893
621,196
kWh
$14,454
1,517
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,968
Cost:
$19,698
$4,579 75,060 $1,932 203 - - $457 - $4,579
75,060
kWh
$1,932
203
kW-months/year
-
-
MMBtu
$457
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,226
Cost:
$4,125
$4,226 69,280 - - - - - - $4,226
69,280
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,555
Cost:
$7,700
$1,118 18,338 $437 68 - - - - $1,118
18,338
kWh
$437
68
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,873
Cost:
$1,872
$1,435 23,514 $438 46 - - - - $1,435
23,514
kWh
$438
46
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$106
Cost:
$51
- - - - $106 42 - - -
-
kWh
-
-
kW-months/year
$106
42
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$67,075
Cost:
$62,374
$49,251 807,388 $17,261 1,834 $106 42 $457 - $49,251
807,388
kWh
$17,261
1,834
kW-months/year
$106
42
MMBtu
$457
-
$
TOTAL IMPLEMENTED Savings:
$106
Cost:
$51
- - - - $106 42 - - -
-
kWh
-
-
kW-months/year
$106
42
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost