Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2004 |
Principal Product | Raw Milk |
NAICS | 112120 - Dairy Cattle and Milk Production |
SIC | 241 - Logging |
Sales | $50,000,000-$100,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 219,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $672,521 | 10,143,272 | kWh | $0.07 |
Electricity Demand | $38,164 | 28,213 | kW-months/year | $1.35 |
LPG | $25,000 | 2,855 | MMBtu | $8.76 |
TOTAL ENERGY COSTS | $735,685 | |||
RECOMMENDED SAVINGS* | $33,118 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,209 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,696 Cost: $45 |
$5,539 | 84,700 | $157 | 116 | - | - |
$5,539 84,700 kWh |
$157 116 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $6,129 Cost: $24,120 |
- | - | - | - | $6,129 | 700 |
- - kWh |
- - kW-months/year |
$6,129 700 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,197 Cost: $468 |
- | - | - | - | $1,197 | 266 |
- - kWh |
- - kW-months/year |
$1,197 266 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $16,379 Cost: $74,008 |
$15,929 | 243,576 | $450 | 334 | - | - |
$15,929 243,576 kWh |
$450 334 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT |
Savings: $396 Cost: $30 |
$385 | 5,891 | $11 | 8 | - | - |
$385 5,891 kWh |
$11 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $738 Cost: $30 |
$729 | 11,160 | $9 | 7 | - | - |
$729 11,160 kWh |
$9 7 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,583 Cost: $6,928 |
$2,511 | 38,389 | $72 | 53 | - | - |
$2,511 38,389 kWh |
$72 53 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,118 Cost: $105,629 |
$25,093 | 383,716 | $699 | 518 | $7,326 | 966 | $25,093 383,716 kWh |
$699 518 kW-months/year |
$7,326 966 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,209 Cost: $74,113 |
$22,582 | 345,327 | $627 | 465 | - | - | $22,582 345,327 kWh |
$627 465 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG |