IAC logo
IAC Assessment: AS0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2004
Principal Product Printed Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 55,000
Annual Production 11,000 Pieces
Production Hrs. Annual 4,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,037 704,764 kWh $0.07
Electricity Demand $7,802 2,509 kW-months/year $3.11
Electricity Fees $565 - $ -
TOTAL ENERGY COSTS $56,404
RECOMMENDED SAVINGS* $33,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$11,500
Cost:
$80
- - - - - - $11,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,500
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,783
Cost:
$400
$8,113 123,224 $1,670 355 - - - - $8,113
123,224
kWh
$1,670
355
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,953
Cost:
$23,750
$3,357 50,868 $596 147 - - - - $3,357
50,868
kWh
$596
147
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$3,384
Cost:
$15,950
- - - - $3,384 720 - - -
-
kWh
-
-
kW-months/year
$3,384
720
MMBtu
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,779
Cost:
$197
$1,591 24,100 $188 70 - - - - $1,591
24,100
kWh
$188
70
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,590
Cost:
$230
$1,590 24,090 - - - - - - $1,590
24,090
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,263
Cost:
$30
$1,073 16,255 $190 47 - - - - $1,073
16,255
kWh
$190
47
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$289
Cost:
$450
$289 4,378 - - - - - - $289
4,378
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,541
Cost:
$41,087
$16,013 242,915 $2,644 619 $3,384 720 $11,500 - $16,013
242,915
kWh
$2,644
619
kW-months/year
$3,384
720
MMBtu
$11,500
-
$
TOTAL IMPLEMENTED Savings:
$24,614
Cost:
$1,157
$11,066 167,957 $2,048 472 - - $11,500 - $11,066
167,957
kWh
$2,048
472
kW-months/year
-
-
MMBtu
$11,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost