IAC logo
IAC Assessment: AS0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2005
Principal Product Food products, snacks
NAICS 311919 - Other Snack Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 128,000
Annual Production 18,500,000 Pounds
Production Hrs. Annual 7,344
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,150 3,452,800 kWh $0.06
Electricity Demand $11,242 6,992 kW-months/year $1.61
Electricity Fees $17,034 - $ -
Natural Gas $271,769 59,622 MMBtu $4.56
TOTAL ENERGY COSTS $496,195
RECOMMENDED SAVINGS* $30,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$19,864
Cost:
$15,000
$19,391 341,329 $473 294 - - - - $19,391
341,329
kWh
$473
294
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,302
Cost:
$1,000
$7,033 72,550 $269 105 - - - - $7,033
72,550
kWh
$269
105
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,147
Cost:
$6,757
$2,066 35,388 $81 50 - - - - $2,066
35,388
kWh
$81
50
kW-months/year
-
-
MMBtu
-
-
lb
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$474
Cost:
$150
- - - - - - $474 14,189 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$474
14,189
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$520
Cost:
$250
- - - - $520 114 - - -
-
kWh
-
-
kW-months/year
$520
114
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$30,307
Cost:
$23,157
$28,490 449,267 $823 449 $520 114 $474 14,189 $28,490
449,267
kWh
$823
449
kW-months/year
$520
114
MMBtu
$474
14,189
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)