IAC Assessment: AS0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2006
Principal Product Helicopters
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $100,000,000-$500,000,000
# of Employees 185
Plant Area (Sq.Ft.) 2,000,000
Annual Production 6 Pieces
Production Hrs. Annual 2,016
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,204 2,383,680 kWh $0.06
Electricity Demand $30,408 19,845 kW-months/year $1.53
TOTAL ENERGY COSTS $174,612
RECOMMENDED SAVINGS* $40,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,968
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$31,751
Cost:
$36,000
$31,751 437,955 - - - - $31,751
437,955
kWh
-
-
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,872
Cost:
$34,827
$3,525 48,622 $347 151 - - $3,525
48,622
kWh
$347
151
kW-months/year
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,096
Cost:
-
- - - - $3,096 - -
-
kWh
-
-
kW-months/year
$3,096
-
$
04: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$1,237
Cost:
-
$1,237 12,480 - - - - $1,237
12,480
kWh
-
-
kW-months/year
-
-
$
05: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$345
Cost:
$2,050
$343 4,801 $2 1 - - $343
4,801
kWh
$2
1
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$40,301
Cost:
$72,877
$36,856 503,858 $349 152 $3,096 - $36,856
503,858
kWh
$349
152
kW-months/year
$3,096
-
$
TOTAL IMPLEMENTED Savings:
$6,968
Cost:
$34,827
$3,525 48,622 $347 151 $3,096 - $3,525
48,622
kWh
$347
151
kW-months/year
$3,096
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes