IAC logo
IAC Assessment: AS0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2018
Principal Product Hard aluminum extrusion
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 90,000
Annual Production 6,000,000 Units
Production Hrs. Annual 8,520
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $925,011 10,733,360 kWh $0.09
Electricity Demand $140,278 26,219 kW-months/year $5.35
Electricity Fees $63,797 - $ -
Natural Gas $142,097 26,257 MMBtu $5.41
TOTAL ENERGY COSTS $1,273,742
RECOMMENDED SAVINGS* $513,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $229,273
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$229,273
Cost:
$13,000
$212,373 2,492,646 $16,900 3,159 - - - - - - - - $212,373
2,492,646
kWh
$16,900
3,159
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$141,718
Cost:
$198,093
$130,112 1,509,418 $11,606 2,169 - - - - - - - - $130,112
1,509,418
kWh
$11,606
2,169
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$108,000
Cost:
$34,970
- - - - - - - - - - $108,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$108,000
-
$
04: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$15,016
Cost:
$6,034
- - - - $15,016 2,775 - - - - - - -
-
kWh
-
-
kW-months/year
$15,016
2,775
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$14,020
Cost:
$33,868
$14,020 162,647 - - - - - - - - - - $14,020
162,647
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$3,500
Cost:
$2,576
- - - - - - $2,349 235 $1,151 235 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,349
235
Tgal
$1,151
235
Tgal
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$1,285
Cost:
-
- - - - $1,285 237 - - - - - - -
-
kWh
-
-
kW-months/year
$1,285
237
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$713
Cost:
$312
$656 7,607 $57 11 - - - - - - - - $656
7,607
kWh
$57
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$513,525
Cost:
$288,853
$357,161 4,172,318 $28,563 5,339 $16,301 3,012 $2,349 235 $1,151 235 $108,000 - $357,161
4,172,318
kWh
$28,563
5,339
kW-months/year
$16,301
3,012
MMBtu
$2,349
235
Tgal
$1,151
235
Tgal
$108,000
-
$
TOTAL IMPLEMENTED Savings:
$229,273
Cost:
$13,000
$212,373 2,492,646 $16,900 3,159 - - - - - - - - $212,373
2,492,646
kWh
$16,900
3,159
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal One-time Revenue or Avoided Cost