IAC logo
IAC Assessment: AS0477
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2019
Principal Product Electron tubes
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 116,000
Annual Production 75,000 Units
Production Hrs. Annual 8,544
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $890,509 15,418,116 kWh $0.06
Electricity Demand $188,529 24,552 kW-months/year $7.68
Electricity Fees $14,963 - $ -
TOTAL ENERGY COSTS $1,094,001
RECOMMENDED SAVINGS* $809,181 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $90,236
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$718,945
Cost:
$688,982
$(-95,607) (-1,593,456) $(-17,188) (-2,238) $831,740 - $(-95,607)
(-1,593,456)
kWh
$(-17,188)
(-2,238)
kW-months/year
$831,740
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$64,747
Cost:
$120,000
$54,329 905,487 $10,418 1,356 - - $54,329
905,487
kWh
$10,418
1,356
kW-months/year
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$17,100
Cost:
$7,907
$14,494 241,582 $2,606 339 - - $14,494
241,582
kWh
$2,606
339
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,264
Cost:
$3,590
$6,158 102,630 $1,106 144 - - $6,158
102,630
kWh
$1,106
144
kW-months/year
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,125
Cost:
$1,213
$1,003 16,716 $122 16 - - $1,003
16,716
kWh
$122
16
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$809,181
Cost:
$821,692
$(-19,623) (-327,041) $(-2,936) (-383) $831,740 - $(-19,623)
(-327,041)
kWh
$(-2,936)
(-383)
kW-months/year
$831,740
-
$
TOTAL IMPLEMENTED Savings:
$90,236
Cost:
$132,710
$75,984 1,266,415 $14,252 1,855 - - $75,984
1,266,415
kWh
$14,252
1,855
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost