IAC logo
IAC Assessment: AS0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 68
Plant Area (Sq.Ft.) 100,000
Annual Production 40,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,088,228 79,413,541 kWh $0.05
Electricity Demand $739,825 130,700 kW-months/year $5.66
Electricity Fees $519,696 - $ -
TOTAL ENERGY COSTS $5,347,749
RECOMMENDED SAVINGS* $2,017,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,567
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,003,559
Cost:
$89,800
- - - - - - $1,003,559 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,003,559
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$874,664
Cost:
$45,574
$760,213 14,761,408 $114,451 20,221 - - - - $760,213
14,761,408
kWh
$114,451
20,221
kW-months/year
-
-
MMBtu
-
-
$
03: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$125,510
Cost:
$39,685
- - - - $(-45,595) (-18,443) $171,105 - -
-
kWh
-
-
kW-months/year
$(-45,595)
(-18,443)
MMBtu
$171,105
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,726
Cost:
$16,955
$7,584 147,258 $1,142 202 - - - - $7,584
147,258
kWh
$1,142
202
kW-months/year
-
-
MMBtu
-
-
$
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$3,278
Cost:
$8,361
$(-31) (-593) - - - - $3,309 - $(-31)
(-593)
kWh
-
-
kW-months/year
-
-
MMBtu
$3,309
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$892
Cost:
$2,659
$892 17,324 - - - - - - $892
17,324
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$568
Cost:
$693
$489 9,487 $79 14 - - - - $489
9,487
kWh
$79
14
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$381
Cost:
$132
$331 6,422 $50 9 - - - - $331
6,422
kWh
$50
9
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,017,578
Cost:
$203,859
$769,478 14,941,306 $115,722 20,446 $(-45,595) (-18,443) $1,177,973 - $769,478
14,941,306
kWh
$115,722
20,446
kW-months/year
$(-45,595)
(-18,443)
MMBtu
$1,177,973
-
$
TOTAL IMPLEMENTED Savings:
$10,567
Cost:
$20,439
$9,296 180,491 $1,271 225 - - - - $9,296
180,491
kWh
$1,271
225
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost