IAC logo
IAC Assessment: AS0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2020
Principal Product Chemicals and Chemical Preparations
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 8,820
Annual Production 13,215,390 Pounds
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $298,975 5,128,303 kWh $0.06
Electricity Demand $75,529 8,914 kW-months/year $8.47
Electricity Fees $15,915 - $ -
TOTAL ENERGY COSTS $390,419
RECOMMENDED SAVINGS* $51,892 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,774
Cost:
$11,876
$15,346 263,252 $3,428 434 - - $15,346
263,252
kWh
$3,428
434
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,308
Cost:
$21,823
$9,512 163,165 $2,296 291 $500 - $9,512
163,165
kWh
$2,296
291
kW-months/year
$500
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,899
Cost:
$28,466
$5,819 99,816 $1,080 137 - - $5,819
99,816
kWh
$1,080
137
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,004
Cost:
$7,027
$6,004 102,980 - - - - $6,004
102,980
kWh
-
-
kW-months/year
-
-
$
05: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$5,105
Cost:
$19,291
$2,798 48,000 $2,307 292 - - $2,798
48,000
kWh
$2,307
292
kW-months/year
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,216
Cost:
$30
$631 10,820 $585 74 - - $631
10,820
kWh
$585
74
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$805
Cost:
$135
$686 11,763 $119 15 - - $686
11,763
kWh
$119
15
kW-months/year
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$675
Cost:
$122
$572 9,811 $103 13 - - $572
9,811
kWh
$103
13
kW-months/year
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$106
Cost:
$394
$90 1,542 $16 2 - - $90
1,542
kWh
$16
2
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$51,892
Cost:
$89,164
$41,458 711,149 $9,934 1,258 $500 - $41,458
711,149
kWh
$9,934
1,258
kW-months/year
$500
-
$
TOTAL IMPLEMENTED Savings:
$675
Cost:
$122
$572 9,811 $103 13 - - $572
9,811
kWh
$103
13
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost