IAC Assessment: AS0501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 9
Plant Area (Sq.Ft.) 20,000
Annual Production 985,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,349 4,257,600 kWh $0.04
Electricity Demand $156,535 8,360 kW-months/year $18.72
Electricity Fees $39,811 - $ -
TOTAL ENERGY COSTS $358,695
RECOMMENDED SAVINGS* $88,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$42,454
Cost:
$940
$26,280 691,572 $16,174 864 - - $26,280
691,572
kWh
$16,174
864
kW-months/year
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$36,391
Cost:
$37,849
$16,341 430,016 $11,550 617 $8,500 - $16,341
430,016
kWh
$11,550
617
kW-months/year
$8,500
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,005
Cost:
$7,546
$1,839 48,408 $1,312 70 $(-146) - $1,839
48,408
kWh
$1,312
70
kW-months/year
$(-146)
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,172
Cost:
$7,423
$879 23,148 $1,293 69 - - $879
23,148
kWh
$1,293
69
kW-months/year
-
-
$
05: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$1,787
Cost:
$103
$724 19,047 $1,063 57 - - $724
19,047
kWh
$1,063
57
kW-months/year
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,736
Cost:
$1,408
$1,373 36,131 $363 19 - - $1,373
36,131
kWh
$363
19
kW-months/year
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,080
Cost:
$2,877
$1,080 28,409 - - - - $1,080
28,409
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$88,625
Cost:
$58,146
$48,516 1,276,731 $31,755 1,696 $8,354 - $48,516
1,276,731
kWh
$31,755
1,696
kW-months/year
$8,354
-
$
TOTAL IMPLEMENTED Savings:
$4,085
Cost:
$10,423
$2,919 76,817 $1,312 70 $(-146) - $2,919
76,817
kWh
$1,312
70
kW-months/year
$(-146)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost