IAC Assessment: AS0504
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0504
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Potable Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales <$500,000
# of Employees 18
Plant Area (Sq.Ft.) 61,006
Annual Production 13,067,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $661,588 12,159,279 kWh $0.05
Electricity Demand $221,627 26,349 kW-months/year $8.41
Electricity Fees $83,879 - $ -
TOTAL ENERGY COSTS $967,094
RECOMMENDED SAVINGS* $93,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,258
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Coal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Coal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$73,584
Cost:
$1,313
- - - - $17,170 - $56,414 - - - -
-
kWh
-
-
kW-months/year
$17,170
-
$
$56,414
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,984
Cost:
$2,000
$3,159 - $5,825 - - - - - - - $3,159
-
kWh
$5,825
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,011
Cost:
$18,815
$2,788 51,241 $1,223 146 - - - - - - $2,788
51,241
kWh
$1,223
146
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,467
Cost:
$4,029
$2,465 45,305 $522 62 - - - - $480 - $2,465
45,305
kWh
$522
62
kW-months/year
-
-
$
-
-
MMBtu
$480
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,778
Cost:
$3,974
$2,778 48,597 - - - - - - - - $2,778
48,597
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$1,029
Cost:
$245
$697 12,890 $332 39 - - - - - - $697
12,890
kWh
$332
39
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$93,853
Cost:
$30,376
$11,887 158,033 $7,902 247 $17,170 - $56,414 - $480 - $11,887
158,033
kWh
$7,902
247
kW-months/year
$17,170
-
$
$56,414
-
MMBtu
$480
-
$
TOTAL IMPLEMENTED Savings:
$16,258
Cost:
$10,248
$9,099 106,792 $6,679 101 - - - - $480 - $9,099
106,792
kWh
$6,679
101
kW-months/year
-
-
$
-
-
MMBtu
$480
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Coal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Coal One-time Revenue or Avoided Cost