IAC logo
IAC Assessment: AS0507
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0507
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 23
Plant Area (Sq.Ft.) 3,260,000
Annual Production 6,205,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,057,653 18,700,148 kWh $0.06
Electricity Demand $295,996 33,086 kW-months/year $8.95
Electricity Fees $226,966 - $ -
TOTAL ENERGY COSTS $1,580,615
RECOMMENDED SAVINGS* $329,209 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$264,515
Cost:
$3,928
$228,338 4,005,928 $36,177 4,939 - - - - $228,338
4,005,928
kWh
$36,177
4,939
kW-months/year
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$38,000
Cost:
$200
- - $29,203 - $8,797 - - - -
-
kWh
$29,203
-
kW-months/year
$8,797
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,118
Cost:
$2,000
$9,612 - $5,506 - - - - - $9,612
-
kWh
$5,506
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,284
Cost:
$15,621
$5,496 96,467 $1,042 142 - - $(-1,254) - $5,496
96,467
kWh
$1,042
142
kW-months/year
-
-
$
$(-1,254)
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,787
Cost:
$2,803
$4,787 83,862 - - - - - - $4,787
83,862
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$1,505
Cost:
$943
$1,351 23,699 $154 21 - - - - $1,351
23,699
kWh
$154
21
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$329,209
Cost:
$25,495
$249,584 4,209,956 $72,082 5,102 $8,797 - $(-1,254) - $249,584
4,209,956
kWh
$72,082
5,102
kW-months/year
$8,797
-
$
$(-1,254)
-
$
TOTAL IMPLEMENTED Savings:
$11,576
Cost:
$19,367
$11,634 204,028 $1,196 163 - - $(-1,254) - $11,634
204,028
kWh
$1,196
163
kW-months/year
-
-
$
$(-1,254)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost