IAC logo
IAC Assessment: AS0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 100
Plant Area (Sq.Ft.) 3,654,000
Annual Production 11,680,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,204,855 35,179,886 kWh $0.03
Electricity Demand $1,333,802 60,073 kW-months/year $22.20
Electricity Fees $463,125 - $ -
Natural Gas $186,680 29,673 MMBtu $6.29
TOTAL ENERGY COSTS $3,188,462
RECOMMENDED SAVINGS* $3,495,938 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,469,969
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product By-product Production Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,163,484
Cost:
$699,500
- - - - $(-108,376) - - - $1,320,570 - $1,951,290 - -
-
kWh
-
-
kW-months/year
$(-108,376)
-
$
-
-
$
$1,320,570
-
$
$1,951,290
-
$
02: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$296,800
Cost:
$1,447,700
$84,940 2,483,626 $211,860 9,543 - - - - - - - - $84,940
2,483,626
kWh
$211,860
9,543
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$25,969
Cost:
$50,414
$7,432 217,296 $18,537 835 - - - - - - - - $7,432
217,296
kWh
$18,537
835
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,685
Cost:
$19,485
$4,153 121,407 $5,555 250 - - $(-23) - - - - - $4,153
121,407
kWh
$5,555
250
kW-months/year
-
-
$
$(-23)
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,495,938
Cost:
$2,217,099
$96,525 2,822,329 $235,952 10,628 $(-108,376) - $(-23) - $1,320,570 - $1,951,290 - $96,525
2,822,329
kWh
$235,952
10,628
kW-months/year
$(-108,376)
-
$
$(-23)
-
$
$1,320,570
-
$
$1,951,290
-
$
TOTAL IMPLEMENTED Savings:
$3,469,969
Cost:
$2,166,685
$89,093 2,605,033 $217,415 9,793 $(-108,376) - $(-23) - $1,320,570 - $1,951,290 - $89,093
2,605,033
kWh
$217,415
9,793
kW-months/year
$(-108,376)
-
$
$(-23)
-
$
$1,320,570
-
$
$1,951,290
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product By-product Production Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product By-product Production