IAC Assessment: AS0569
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0569
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product Precision Power Analog Components
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 52,800
Annual Production 36,000,000 Units
Production Hrs. Annual 5,776
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,060 1,689,301 kWh $0.07
Electricity Demand $74,633 4,007 kW-months/year $18.63
Electricity Fees $34,835 - $ -
Natural Gas $20,889 1,665 MMBtu $12.55
TOTAL ENERGY COSTS $252,417
RECOMMENDED SAVINGS* $52,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,436
Cost:
$18,656
$16,654 230,343 $11,292 606 - - $2,490 - - - $16,654
230,343
kWh
$11,292
606
kW-months/year
-
-
MMBtu
$2,490
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,444
Cost:
$7,395
$6,260 86,583 $3,184 171 - - - - - - $6,260
86,583
kWh
$3,184
171
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,717
Cost:
$3,715
$3,599 49,771 $2,118 114 - - - - - - $3,599
49,771
kWh
$2,118
114
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,945
Cost:
$490
- - - - $4,464 356 - - $(-519) - -
-
kWh
-
-
kW-months/year
$4,464
356
MMBtu
-
-
$
$(-519)
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,653
Cost:
$5,151
$1,759 24,333 $894 48 - - - - - - $1,759
24,333
kWh
$894
48
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$327
Cost:
$146
$217 3,004 $110 6 - - - - - - $217
3,004
kWh
$110
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$229
Cost:
$86
$153 2,114 $76 4 - - - - - - $153
2,114
kWh
$76
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,751
Cost:
$35,639
$28,642 396,148 $17,674 949 $4,464 356 $2,490 - $(-519) - $28,642
396,148
kWh
$17,674
949
kW-months/year
$4,464
356
MMBtu
$2,490
-
$
$(-519)
-
$
TOTAL IMPLEMENTED Savings:
$36,480
Cost:
$22,517
$20,470 283,118 $13,520 726 - - $2,490 - - - $20,470
283,118
kWh
$13,520
726
kW-months/year
-
-
MMBtu
$2,490
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost