IAC logo
IAC Assessment: AS0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2025
Principal Product Flexible Packaging
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 113,500
Annual Production 13,000,000 Pounds
Production Hrs. Annual 4,752
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $444,245 6,538,546 kWh $0.07
Electricity Demand $378,664 20,554 kW-months/year $18.42
Electricity Fees $59,545 - $ -
Natural Gas $289,602 38,775 MMBtu $7.47
Other Energy $39,979 1 MMBtu $39,979.00
TOTAL ENERGY COSTS $1,212,035
RECOMMENDED SAVINGS* $116,002 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$83,160
Cost:
$515,135
$54,860 807,957 $28,300 1,536 - - $54,860
807,957
kWh
$28,300
1,536
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$28,514
Cost:
$46,000
- - $28,514 1,548 - - -
-
kWh
$28,514
1,548
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,851
Cost:
$2,568
$926 13,655 $635 35 $290 - $926
13,655
kWh
$635
35
kW-months/year
$290
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$869
Cost:
$3,646
$670 9,869 $199 11 - - $670
9,869
kWh
$199
11
kW-months/year
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$834
Cost:
$1,268
$834 12,276 - - - - $834
12,276
kWh
-
-
kW-months/year
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$559
Cost:
$17
$290 4,257 $101 6 $168 - $290
4,257
kWh
$101
6
kW-months/year
$168
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$215
Cost:
$315
$128 1,881 $87 5 - - $128
1,881
kWh
$87
5
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$116,002
Cost:
$568,949
$57,708 849,895 $57,836 3,140 $458 - $57,708
849,895
kWh
$57,836
3,140
kW-months/year
$458
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost