IAC logo
IAC Assessment: AT0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1986
Principal Product ANALOG DEVICES
NAICS n/a
SIC 3571 - Electronic Computers
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 317,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $516,884 11,286,929 kWh $0.05
Fuel Oil #2 $32,390 9,100 MMBtu $3.56
TOTAL ENERGY COSTS $549,274
RECOMMENDED SAVINGS* $27,223 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,737
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$966
Cost:
$626
$966 21,102 - - $966
21,102
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$107
Cost:
$180
$107 2,345 - - $107
2,345
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$295
Cost:
$250
$295 6,448 - - $295
6,448
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$604
Cost:
$100
$604 13,189 - - $604
13,189
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,087
Cost:
$2,000
$1,087 23,740 - - $1,087
23,740
kWh
-
-
MMBtu
06: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$1,033
Cost:
-
$1,033 22,567 - - $1,033
22,567
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$738
Cost:
-
$738 16,120 - - $738
16,120
kWh
-
-
MMBtu
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$6,965
Cost:
$1,000
$6,965 152,110 - - $6,965
152,110
kWh
-
-
MMBtu
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,428
Cost:
$10,000
$23,082 504,103 $(-7,654) (-2,150) $23,082
504,103
kWh
$(-7,654)
(-2,150)
MMBtu
TOTAL RECOMMENDED Savings:
$27,223
Cost:
$14,156
$34,877 761,724 $(-7,654) (-2,150) $34,877
761,724
kWh
$(-7,654)
(-2,150)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,737
Cost:
$626
$2,737 59,789 - - $2,737
59,789
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas