IAC logo
IAC Assessment: AT0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1986
Principal Product BATTERIES
NAICS n/a
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,043,881 21,919,989 kWh $0.05
Natural Gas $218,137 40,829 MMBtu $5.34
TOTAL ENERGY COSTS $1,262,018
RECOMMENDED SAVINGS* $70,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,160
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$447
Cost:
$612
$447 9,379 - - - - $447
9,379
kWh
-
-
MMBtu
-
-
$
02: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$3,755
Cost:
$2,000
$3,755 78,839 - - - - $3,755
78,839
kWh
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$26,952
Cost:
$10,000
$50,019 1,050,117 $(-23,067) (-4,479) - - $50,019
1,050,117
kWh
$(-23,067)
(-4,479)
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,635
Cost:
$500
- - $4,635 900 - - -
-
kWh
$4,635
900
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,743
Cost:
$12,000
- - $15,743 3,057 - - -
-
kWh
$15,743
3,057
MMBtu
-
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$14,839
Cost:
$5,000
$14,839 311,547 - - - - $14,839
311,547
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,232
Cost:
$500
- - $1,232 239 - - -
-
kWh
$1,232
239
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$586
Cost:
-
$586 12,309 - - - - $586
12,309
kWh
-
-
MMBtu
-
-
$
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,006
Cost:
-
$2,806 58,910 - - $(-800) - $2,806
58,910
kWh
-
-
MMBtu
$(-800)
-
$
TOTAL RECOMMENDED Savings:
$70,195
Cost:
$30,612
$72,452 1,521,101 $(-1,457) (-283) $(-800) - $72,452
1,521,101
kWh
$(-1,457)
(-283)
MMBtu
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$33,160
Cost:
$12,612
$57,027 1,197,245 $(-23,067) (-4,479) $(-800) - $57,027
1,197,245
kWh
$(-23,067)
(-4,479)
MMBtu
$(-800)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes